Capabilities directory

Find your team’s next superpower.

Results

37 capabilities, showing 1 to 24

  • Acceptance criteria sheet

    Hand a developer or agency a story with its definition of done written down: testable expected behaviours, error cases and edge cases, each traced to a rule or design state, with the unclear terms and open questions listed for the product owner.

  • Assumption map

    For a product owner whose plan rests on beliefs nobody has tested: each belief is written down, set against the evidence you hold, ranked by what it would do to the plan, and given a cheap test to choose from. You decide what to test; no evidence is invented.

  • Business continuity plan

    For an owner or operations manager: the activities the business cannot stop for long, how long each can be down and how much data it can lose, what each depends on, the fallback for each, and named owners, deputies, contacts and a test date, ready for a competent reviewer and the owner's approval.

  • Business model assumptions review

    Before you commit money to a new or revised business model, see it block by block with every claim marked evidenced or assumed, the riskiest assumptions ranked, and the cheapest test for each. You choose what to test; no projection or valuation is made.

  • Cloud spend variance bridge

    When cloud or tooling costs move away from budget, the finance lead and the engineering manager get a bridge from budget to actual by service and cost owner, with usage beside each large move, the unallocated and shared costs, and the questions each side must answer.

  • Component inventory audit

    When patterns come up for review, the design-system owner gets an inventory built from the library export and its documentation: every component with its naming, token and state gaps, and the pairs that may overlap. Nothing is merged on appearance; the owner decides.

  • Contractor safety prequalification

    For a named job, the operations, facilities or site manager gets a safety questionnaire scaled to the risk of the work, then a record of the contractor's answers scored only on the evidence supplied, with every gap, the conditions that close it and a review date. A competent person decides.

  • Current experience baseline

    Before a redesign, the design lead gets a baseline built from the captures and page list they supply: each page read with its content and design observations, the patterns that recur, and the pages outside the evidence. The lead confirms the baseline and sets the scope.

  • Customer feedback themes

    Each month your support lead sees what customers keep telling you: tickets, disputes, reviews and survey comments grouped into themes with counts and quotations, the three issues most worth fixing with a proposed fix and owner, and a note for customers once a fix ships. A person decides every fix.

  • Customer interview synthesis

    Turn a stack of customer call notes into the answer to one question, in your customers’ own words. Every quotation is cited to the note it came from, every theme shows its confidence and the evidence against it, and nothing is claimed that the notes do not say.

  • Emergency drill brief

    Before a fire, evacuation or other drill, the site or office manager gets one brief: the scenario the responsible person has approved, who does what, what each observer records, and the questions for the debrief. It writes no emergency plan.

  • Emissions activity data schedule

    When the reporting period closes, the environmental reporting owner gets one source-linked schedule of energy, fuel and transport quantities with units and the boundary supplied, estimates kept apart from measured activity, missing factor references and gaps listed. It calculates no emissions figure.

  • Employee offboarding and handover checklist

    When someone leaves, your HR lead and their manager share one checklist: every piece of their work handed to a named colleague before the last day, every system on your access register removed by its owner at a set time, and every item of equipment back. Nothing is removed or sent without a person.

  • Ergonomic review inputs

    For a supervisor preparing for an ergonomics assessor or a worker's complaint about a task: a task observation record of each step's movements, durations, loads and measurements as supplied, the measurements still missing, and what the people who do the task said.

  • Feedback follow-through updates

    When a change ships or a decision lands on something customers asked for, your account owner gets the list of who asked, the confirmed status of each request, and an individual draft update for each person in the channel they prefer. No update promises a date or feature the team has not confirmed.

  • Incident investigation and corrective actions

    After an injury, near miss or property damage, the site, operations or safety manager gets the investigation written up from the evidence: a timeline, the immediate and underlying causes, actions with owners and dates, and a register that follows each action until a check shows it worked.

  • Journey accessibility findings

    When a user journey is ready for accessibility review, the reviewer gets a finding list: each finding with its task impact and evidence, the manual checks still required and the limits of the review. The reviewer verifies every finding and agrees fixes with the design owner.

  • Learning system access review

    At term end or after staff change roles, the system owner lays the learning system's user and access exports beside current staff, class assignments and the approved role matrix. Departed users, changed roles and dormant accounts come back as questions for the data owners. Nothing is changed.

  • Lone work arrangements review

    For each task someone does alone, the manager gets the check-in method, the places where nobody could be reached, who responds when a check-in is missed and how soon, and alternatives. A competent person decides what is acceptable.

  • Online class setup packet

    The learning-platform administrator receives one complete request for an approved class: course name, section, room, responsible teacher, the people who can be invited and every roster exception, drawn from the approved details and the roster export.

  • Pilot acceptance-test preparation

    Go into every AI pilot with the test already written: the cases that matter, what good looks like for each and the rule your owner will use to decide.

  • Preventive maintenance plan

    For one site, the facilities or operations manager gets every piece of equipment ranked by failure cost, an approach for each (run to failure, scheduled or condition-based), a dated calendar of tasks from the maker's guidance and the failure history, the spare parts to hold and the downtime measures to track.

  • Product pricing options

    A product owner weighing how to price or package a product gets one options brief: what each customer group uses, the willingness-to-pay evidence held with stated kept apart from observed, what each option would bill every account, the uncertainties and the tests. It recommends no price.

  • Product sample feedback revision list

    After each round of samples, your product lead gets one revision list by sample version and feature: the changes people agree on, the feedback that conflicts, and drafted notes for the next supplier brief. The product owner decides.