Capabilities directory
Find your team’s next superpower.
- Function: Health, safety and environment
- Function: Procurement and suppliers
- Industry: Hospitality
- Industry: Insurance
- Clear all filters
Results
8 capabilities
Emergency drill brief
Before a fire, evacuation or other drill, the site or office manager gets one brief: the scenario the responsible person has approved, who does what, what each observer records, and the questions for the debrief. It writes no emergency plan.
Preventive maintenance plan
For one site, the facilities or operations manager gets every piece of equipment ranked by failure cost, an approach for each (run to failure, scheduled or condition-based), a dated calendar of tasks from the maker's guidance and the failure history, the spare parts to hold and the downtime measures to track.
Site safety induction pack
For one named site, the site, facilities or people lead gets an induction built from that site's own emergency arrangements, rules and hazards, with a short check of understanding, a sign-off record for each person and refresher dates by role. A competent person approves it and delivers it.
Supplier bill review and payment-run preparation
Before each payment run, the person who approves it gets one sheet: every supplier bill checked against its purchase order and what was received, duplicates and changed bank details stopped, credits shown, and a proposed run with its total. Nothing is paid until a person approves.
Supplier issue notice
When a supplier bills for more than was ordered or received, or falls short of an agreed delivery or quality target, the buyer gets a formal notice ready for approval: each problem set against the record, the evidence listed, what the supplier must do and the date to reply by. A person approves and sends it.
Supplier spend analysis
From one accounts-payable export, the finance or operations lead sees where the money goes: spend cleaned and grouped by category and supplier, the few suppliers that take most of it, the tail, needs bought from several suppliers and consolidation opportunities, each with its figures. A person decides what to act on.
Vendor quote comparison
Before anyone signs, the person choosing a vendor gets one sheet: the criteria agreed first, every quote costed the same way, and each vendor eliminated with its reason, on hold with the question that settles it, or shortlisted with its trade-offs. A person chooses; contract terms go to your reviewer.
Workplace risk assessment
For one task or workplace, the site or operations manager gets each hazard, who could be harmed, the controls already in place, a likelihood-and-severity rating before and after, and further controls with an owner and a date, ready for a competent person to review and sign.