Capabilities directory
Find your team’s next superpower.
- Function: Health, safety and environment
- Function: Quality management
- Industry: Energy
- Industry: Finance and investment
- Clear all filters
Results
5 capabilities
Client report check log
Before a batch of client reports is released, the reporting lead gets a log, report by report, of household membership, periods, totals against the custodian statements, fee figures and missing sections, with every difference marked for correction. Nothing is released or sent.
Emissions activity data schedule
When the reporting period closes, the environmental reporting owner gets one source-linked schedule of energy, fuel and transport quantities with units and the boundary supplied, estimates kept apart from measured activity, missing factor references and gaps listed. It calculates no emissions figure.
Lone work arrangements review
For each task someone does alone, the manager gets the check-in method, the places where nobody could be reached, who responds when a check-in is missed and how soon, and alternatives. A competent person decides what is acceptable.
Spreadsheet check before sharing
Before a model or schedule goes to a client, a lender or a board, the sender gets one report on it: every error value, short total, buried assumption and hidden row pinned to its cell, each with a fix or a question, and a plain list of what was not checked. Nothing in the workbook is changed.
Temporary change register
For a site or operations manager with temporary changes to equipment, layout or process still in place: a register of every change with its expiry date, the checks still outstanding and the procedures and training it touches, ready for the competent person who decides what happens next.