Capabilities directory

Find your team’s next superpower.

Results

8 capabilities

  • Client report check log

    Before a batch of client reports is released, the reporting lead gets a log, report by report, of household membership, periods, totals against the custodian statements, fee figures and missing sections, with every difference marked for correction. Nothing is released or sent.

  • Contractor safety prequalification

    For a named job, the operations, facilities or site manager gets a safety questionnaire scaled to the risk of the work, then a record of the contractor's answers scored only on the evidence supplied, with every gap, the conditions that close it and a review date. A competent person decides.

    • Procurement and suppliers (filtered by)
    • Real estate (filtered by)
    • Construction
  • Punch list consolidation

    The site manager gets the punch list for the next closeout walk as one list grouped by location and trade, with repeated entries merged, photographs attached and a proposed follow-up date for each open item. Nothing is assigned, closed or accepted.

  • Service provider evidence matrix

    When a material service provider needs approval or renewal, the vendor owner gets one matrix: the provider's evidence set against the firm's own review criteria, with self-attestations, dated reports and untested claims kept apart from independent evidence, and every unanswered question listed.

    • Procurement and suppliers (filtered by)
    • Finance and investment (filtered by)
    • Insurance (filtered by)
  • Spreadsheet check before sharing

    Before a model or schedule goes to a client, a lender or a board, the sender gets one report on it: every error value, short total, buried assumption and hidden row pinned to its cell, each with a fix or a question, and a plain list of what was not checked. Nothing in the workbook is changed.

  • Submittal register review

    The project engineer gets one register of every required submittal: what has arrived, the review status as recorded, the documents still missing and the long-lead items at risk against the date each order must be placed. Nothing is routed, accepted or ordered.

  • Three-week look-ahead constraint review

    Before the coordination meeting, the superintendent gets a brief that sets each planned activity of the next three weeks beside what could hold it up: trades sharing an area, unfinished predecessors, open approvals, late deliveries and unanswered RFIs. The superintendent confirms the sequence and assigns the follow-up.

  • Vendor insurance certificate check

    For a property manager collecting insurance certificates from service vendors: each certificate's fields set beside the requirements the team already approved, every stated expiration date listed, and draft requests for what is missing. The manager reviews gaps with the insurance adviser before accepting anything.

    • Procurement and suppliers (filtered by)
    • Real estate (filtered by)
    • Construction