Capabilities directory
Find your team’s next superpower.
- Industry: Energy
- Industry: Hardware and physical technology
- Industry: Hospitality
- Business situation: Growth & scaling
- Clear all filters
Results
45 capabilities, showing 1 to 24
Acceptance criteria sheet
Hand a developer or agency a story with its definition of done written down: testable expected behaviours, error cases and edge cases, each traced to a rule or design state, with the unclear terms and open questions listed for the product owner.
Assumption map
For a product owner whose plan rests on beliefs nobody has tested: each belief is written down, set against the evidence you hold, ranked by what it would do to the plan, and given a cheap test to choose from. You decide what to test; no evidence is invented.
Channel partner fit review
When a referral, reseller or alliance partner approaches, the founder or head of partnerships gets one review: evidence the partner brings customers of its own, the type that evidence supports, a ninety-day plan with signs to go on or stop, and the commission range that still beats selling direct. A person decides.
Component end-of-life exposure brief
When a supplier announces a component constraint or end-of-life date, the sourcing lead gets one brief: where the part is used, stock and demand set against the stated dates, and questions about replacements, with unverified availability kept apart from approved supply.
Customer feedback themes
Each month your support lead sees what customers keep telling you: tickets, disputes, reviews and survey comments grouped into themes with counts and quotations, the three issues most worth fixing with a proposed fix and owner, and a note for customers once a fix ships. A person decides every fix.
Emergency drill brief
Before a fire, evacuation or other drill, the site or office manager gets one brief: the scenario the responsible person has approved, who does what, what each observer records, and the questions for the debrief. It writes no emergency plan.
Engineering change affected records index
When an engineering change request enters review, the document controller gets one index: the assemblies, revisions, stock and open purchase orders the change reaches in the exports supplied, and a question for each owner wherever the records are unclear.
Evaluation unit trial review
When a customer's evaluation reaches its review milestone, the account engineer and account owner get a trial-review agenda that sets the agreed use case beside the recorded results, setup changes and feedback, with every gap turned into a question and next-step options.
Field service invoice evidence check
When completed field work is ready for invoicing, the billing manager gets draft billing lines that tie the agreed rates to crew time, equipment use, mobilization and signed service tickets. Unsigned tickets, overlapping equipment days and unsupported extras are listed as exceptions.
Hiring pipeline status report
Each week your people lead or founder sees every open role on one page: applications at each stage, days open against the target, roles running late, pass-through between stages, which sources lead to interviews, and every blocker with its owner. It counts; it never assesses a candidate.
Interview plan and scorecard
Before the first interview, the hiring manager and every interviewer share one plan: the criteria the role needs, the same questions in the same order for every candidate, and a blank scorecard each person fills in alone. It rates no one. People make every decision about a candidate.
Interview process review after a hiring round
After a hiring round closes, the recruiting lead gets a review of the interview process: questions that gave no usable evidence, competencies nobody covered, inconsistent rubric use, and revisions to approve before the next search. It reviews the process only; no candidate is assessed.
Investor update
Each month or quarter, the founder gets a drafted update for investors: the headline, key figures against plan and last period, cash and runway, wins, problems told plainly with what is being done, and specific asks. Every figure comes from the company's own reports. The founder approves and sends it.
Job description
A hiring manager’s rough notes become a job description the right people want to answer: why the role exists, the work itself, and only the must-haves that are real. Your approved pay and employer wording go in untouched, and nothing is posted until the hiring manager and the people lead approve it.
Job posting and sourcing plan
For one approved role, the hiring manager gets a plan for where to post and where to look: every channel on the company's own list ordered by the signal it should give for that kind of role, a week-by-week schedule inside the budget, and what to count on each channel. Nothing is posted or paid until a person approves.
Job readiness packet
Before an order goes to the floor, the production or quality lead gets one packet: each requirement matched to its approved drawing, specification or inspection plan, with conflicting revisions, gaps and material shortfalls listed. The owners decide; nothing is approved or released.
Kit component availability check
The stock or online-store lead gets every kit beside the quantity actually sellable, the component that limits it, the stock records that disagree and the listings that promise more than can be built. Nothing is changed until a person decides.
Lone work arrangements review
For each task someone does alone, the manager gets the check-in method, the places where nobody could be reached, who responds when a check-in is missed and how soon, and alternatives. A competent person decides what is acceptable.
Menu input cost change review
When supplier prices change, the chef and food-and-beverage manager get one worksheet: each price movement tied to the quantities in the supplied recipes, the cost per portion of every affected dish before and after, and questions for the chef. It sets no menu price.
Offtake statement variance check
When a buyer's offtake statement differs from the energy sales ledger, the settlement analyst gets one comparison: volumes, periods, prices and adjustments set against the metered-volume export and the agreed price inputs, each discrepancy traced to its source. Nothing is disputed or adjusted.
Pilot build readiness brief
Before a prototype or pilot build, the build lead gets one brief: part shortages, revision conflicts and open actions set against the team’s own build checklist, with allocated parts kept apart from received ones. People confirm; nothing is released.
Preventive maintenance plan
For one site, the facilities or operations manager gets every piece of equipment ranked by failure cost, an approach for each (run to failure, scheduled or condition-based), a dated calendar of tasks from the maker's guidance and the failure history, the spare parts to hold and the downtime measures to track.
Price change review
Before prices change, the owner or finance lead gets one review: the margin on each product or service from the sales and cost exports, how costs have moved, what each proposed price does to sales and gross profit across a stated range of customer responses, and dated competitor prices. It recommends no price.
Product configuration margin sheet
When sales prepares a quote for a product configuration, the commercial owner and finance lead get one worksheet: the quoted price, the costed bill of materials, assembly and freight, and the allocations, with every unquoted part, one-off charge and uncertain volume listed as an open assumption.