Capabilities directory

Find your team’s next superpower.

Results

51 capabilities, showing 1 to 24

  • Acceptance criteria sheet

    Hand a developer or agency a story with its definition of done written down: testable expected behaviours, error cases and edge cases, each traced to a rule or design state, with the unclear terms and open questions listed for the product owner.

  • Asset register to invoice reconciliation

    When new equipment, transfers or retirements must reach the reporting pack, the asset accountant gets a proposed register update matched to purchase records, commissioning evidence and the ledger, with duplicate IDs, unmatched invoices and uncertain in-service dates listed.

  • Asset replacement options comparison

    When an aging asset has more than one proposed replacement or upgrade, the finance lead and the engineering owner get one workbook: the supplied costs, operating assumptions and lives on one basis, with price-basis gaps, unverified savings and open sensitivity questions marked. It recommends no spend.

  • Assumption map

    For a product owner whose plan rests on beliefs nobody has tested: each belief is written down, set against the evidence you hold, ranked by what it would do to the plan, and given a cheap test to choose from. You decide what to test; no evidence is invented.

  • Channel partner fit review

    When a referral, reseller or alliance partner approaches, the founder or head of partnerships gets one review: evidence the partner brings customers of its own, the type that evidence supports, a ninety-day plan with signs to go on or stop, and the commission range that still beats selling direct. A person decides.

  • Component end-of-life exposure brief

    When a supplier announces a component constraint or end-of-life date, the sourcing lead gets one brief: where the part is used, stock and demand set against the stated dates, and questions about replacements, with unverified availability kept apart from approved supply.

  • Contractor safety prequalification

    For a named job, the operations, facilities or site manager gets a safety questionnaire scaled to the risk of the work, then a record of the contractor's answers scored only on the evidence supplied, with every gap, the conditions that close it and a review date. A competent person decides.

  • Design assumption change register

    When client criteria or design assumptions change, the project engineer gets one sourced register: what changed, which recorded requirements it touches, how firm each source is, and what still needs confirmation. No design basis is altered.

  • Emissions activity data schedule

    When the reporting period closes, the environmental reporting owner gets one source-linked schedule of energy, fuel and transport quantities with units and the boundary supplied, estimates kept apart from measured activity, missing factor references and gaps listed. It calculates no emissions figure.

  • Engineering change affected records index

    When an engineering change request enters review, the document controller gets one index: the assemblies, revisions, stock and open purchase orders the change reaches in the exports supplied, and a question for each owner wherever the records are unclear.

  • Evaluation unit trial review

    When a customer's evaluation reaches its review milestone, the account engineer and account owner get a trial-review agenda that sets the agreed use case beside the recorded results, setup changes and feedback, with every gap turned into a question and next-step options.

    • Sales
    • Energy (filtered by)
    • Hardware and physical technology (filtered by)
  • Executive week-ahead calendar review

    Before the week starts, the executive assistant hands the executive one brief: every clash, every journey or run of meetings with too little time, every meeting with no stated purpose or no preparation time, and proposed time for the week's priorities. Nothing is accepted, declined, moved or sent.

  • Field issue handoff to engineering

    When a delivered product misbehaves for a customer, the customer service lead gets one case brief for engineering: the revision and serial references, the symptoms as reported, the photographs supplied, what service has done and the questions still unanswered. It names no cause.

  • Field service invoice evidence check

    When completed field work is ready for invoicing, the billing manager gets draft billing lines that tie the agreed rates to crew time, equipment use, mobilization and signed service tickets. Unsigned tickets, overlapping equipment days and unsupported extras are listed as exceptions.

  • Inbox triage

    The owner, or the assistant who keeps their inbox, starts the day knowing what needs a reply today, what can wait and until when, and what belongs to someone else, with a draft or a forwarding note for each. Nothing is sent, archived, deleted or moved, and no mailbox login is needed.

  • Investor update

    Each month or quarter, the founder gets a drafted update for investors: the headline, key figures against plan and last period, cash and runway, wins, problems told plainly with what is being done, and specific asks. Every figure comes from the company's own reports. The founder approves and sends it.

  • Job readiness packet

    Before an order goes to the floor, the production or quality lead gets one packet: each requirement matched to its approved drawing, specification or inspection plan, with conflicting revisions, gaps and material shortfalls listed. The owners decide; nothing is approved or released.

  • Kit component availability check

    The stock or online-store lead gets every kit beside the quantity actually sellable, the component that limits it, the stock records that disagree and the listings that promise more than can be built. Nothing is changed until a person decides.

  • Lender draw package index

    Before a monthly draw goes to the lender, the project finance lead has an index in the lender’s own order: every required document listed or missing, and every invoice set against the ledger. The lender decides funding; nothing is submitted.

  • Listing copy fact check

    The listing agent or marketing lead gets draft listing copy in which every statement is tied to the property sheet, a measurement or a photo, with unsupported descriptions marked and kept out. The listing broker approves; the designated reviewer checks advertising requirements.

  • Lone work arrangements review

    For each task someone does alone, the manager gets the check-in method, the places where nobody could be reached, who responds when a check-in is missed and how soon, and alternatives. A competent person decides what is acceptable.

  • Offtake statement variance check

    When a buyer's offtake statement differs from the energy sales ledger, the settlement analyst gets one comparison: volumes, periods, prices and adjustments set against the metered-volume export and the agreed price inputs, each discrepancy traced to its source. Nothing is disputed or adjusted.

  • Pay application line check

    Before a progress billing goes on, the project accountant has every line compared with the schedule of values, the last certificate, the approved changes and the evidence supplied, with each arithmetic difference listed. The authorized certifier decides payment; nothing is certified.

  • Pilot build readiness brief

    Before a prototype or pilot build, the build lead gets one brief: part shortages, revision conflicts and open actions set against the team’s own build checklist, with allocated parts kept apart from received ones. People confirm; nothing is released.