Capabilities directory
Capabilities for energy or real estate
Results
29 capabilities, showing 1 to 24
Asset register to invoice reconciliation
When new equipment, transfers or retirements must reach the reporting pack, the asset accountant gets a proposed register update matched to purchase records, commissioning evidence and the ledger, with duplicate IDs, unmatched invoices and uncertain in-service dates listed.
Asset replacement options comparison
When an aging asset has more than one proposed replacement or upgrade, the finance lead and the engineering owner get one workbook: the supplied costs, operating assumptions and lives on one basis, with price-basis gaps, unverified savings and open sensitivity questions marked. It recommends no spend.
Contractor safety prequalification
For a named job, the operations, facilities or site manager gets a safety questionnaire scaled to the risk of the work, then a record of the contractor's answers scored only on the evidence supplied, with every gap, the conditions that close it and a review date. A competent person decides.
Design assumption change register
When client criteria or design assumptions change, the project engineer gets one sourced register: what changed, which recorded requirements it touches, how firm each source is, and what still needs confirmation. No design basis is altered.
Emissions activity data schedule
When the reporting period closes, the environmental reporting owner gets one source-linked schedule of energy, fuel and transport quantities with units and the boundary supplied, estimates kept apart from measured activity, missing factor references and gaps listed. It calculates no emissions figure.
Engineering change affected records index
When an engineering change request enters review, the document controller gets one index: the assemblies, revisions, stock and open purchase orders the change reaches in the exports supplied, and a question for each owner wherever the records are unclear.
Evaluation unit trial review
When a customer's evaluation reaches its review milestone, the account engineer and account owner get a trial-review agenda that sets the agreed use case beside the recorded results, setup changes and feedback, with every gap turned into a question and next-step options.
Executive week-ahead calendar review
Before the week starts, the executive assistant hands the executive one brief: every clash, every journey or run of meetings with too little time, every meeting with no stated purpose or no preparation time, and proposed time for the week's priorities. Nothing is accepted, declined, moved or sent.
Field service invoice evidence check
When completed field work is ready for invoicing, the billing manager gets draft billing lines that tie the agreed rates to crew time, equipment use, mobilization and signed service tickets. Unsigned tickets, overlapping equipment days and unsupported extras are listed as exceptions.
Inbox triage
The owner, or the assistant who keeps their inbox, starts the day knowing what needs a reply today, what can wait and until when, and what belongs to someone else, with a draft or a forwarding note for each. Nothing is sent, archived, deleted or moved, and no mailbox login is needed.
Lender draw package index
Before a monthly draw goes to the lender, the project finance lead has an index in the lender’s own order: every required document listed or missing, and every invoice set against the ledger. The lender decides funding; nothing is submitted.
Listing copy fact check
The listing agent or marketing lead gets draft listing copy in which every statement is tied to the property sheet, a measurement or a photo, with unsupported descriptions marked and kept out. The listing broker approves; the designated reviewer checks advertising requirements.
Lone work arrangements review
For each task someone does alone, the manager gets the check-in method, the places where nobody could be reached, who responds when a check-in is missed and how soon, and alternatives. A competent person decides what is acceptable.
Offtake statement variance check
When a buyer's offtake statement differs from the energy sales ledger, the settlement analyst gets one comparison: volumes, periods, prices and adjustments set against the metered-volume export and the agreed price inputs, each discrepancy traced to its source. Nothing is disputed or adjusted.
Pay application line check
Before a progress billing goes on, the project accountant has every line compared with the schedule of values, the last certificate, the approved changes and the evidence supplied, with each arithmetic difference listed. The authorized certifier decides payment; nothing is certified.
Preventive maintenance plan
For one site, the facilities or operations manager gets every piece of equipment ranked by failure cost, an approach for each (run to failure, scheduled or condition-based), a dated calendar of tasks from the maker's guidance and the failure history, the spare parts to hold and the downtime measures to track.
Property diligence index
The transaction lead gets a diligence room in order: every document indexed by workstream, every checklist item and request tracked, and every open finding tied to the report or request that raised it. Specialists judge the findings; nothing is valued or sent.
Property owner report
A property manager gets the month's owner report drafted from the statements and logs they supply: occupancy, collections, open maintenance and the decisions the owner is asked to make, each statement traced to its source and each gap shown.
Punch list consolidation
The site manager gets the punch list for the next closeout walk as one list grouped by location and trade, with repeated entries merged, photographs attached and a proposed follow-up date for each open item. Nothing is assigned, closed or accepted.
Recurring repair service history
When repeated maintenance keeps disturbing guests, the facilities manager gets one brief by equipment and room area: repeated work orders, confirmed service interruptions and missing inspection records side by side. It finds no cause and orders no work.
Rent roll to lease abstract match
Your property accountant gets the rent roll checked against the verified lease abstracts and amendments, unit by unit: rent, area, commencement and expiration, with every difference listed for review. It compares supplied fields only and corrects nothing.
Service visit work packet
Before a planned visit to a turbine, inverter or terminal asset, the maintenance supervisor gets one packet built from the logs and approved scope supplied: reported symptoms, previous visits, open parts requests and access questions. It judges no condition and sends nothing.
Spreadsheet check before sharing
Before a model or schedule goes to a client, a lender or a board, the sender gets one report on it: every error value, short total, buried assumption and hidden row pinned to its cell, each with a fix or a question, and a plain list of what was not checked. Nothing in the workbook is changed.
Submittal register review
The project engineer gets one register of every required submittal: what has arrived, the review status as recorded, the documents still missing and the long-lead items at risk against the date each order must be placed. Nothing is routed, accepted or ordered.