Workflows Directory

Find your team’s next superpower.

Results

6 workflow templates

  • Channel partner fit review

    When a referral, reseller or alliance partner approaches, the founder or head of partnerships gets one review: evidence the partner brings customers of its own, the type that evidence supports, a ninety-day plan with signs to go on or stop, and the commission range that still beats selling direct. A person decides.

    Starts it
    Founder
    Brings
    export, notes, document, pasted text
    Gets
    7 outputs
    • Sales
    • Leadership (filtered by)
    • Hardware and physical technology (filtered by)
  • Engineering change affected records index

    When an engineering change request enters review, the document controller gets one index: the assemblies, revisions, stock and open purchase orders the change reaches in the exports supplied, and a question for each owner wherever the records are unclear.

    Starts it
    Document controller
    Brings
    export, notes
    Gets
    3 outputs
    • Operations and process improvement (filtered by)
    • Hardware and physical technology (filtered by)
    • Consumer brands
  • Investor update

    Each month or quarter, the founder gets a drafted update for investors: the headline, key figures against plan and last period, cash and runway, wins, problems told plainly with what is being done, and specific asks. Every figure comes from the company's own reports. The founder approves and sends it.

    Starts it
    Founder
    Brings
    export, notes, pasted text
    Gets
    3 outputs
  • Job readiness packet

    Before an order goes to the floor, the production or quality lead gets one packet: each requirement matched to its approved drawing, specification or inspection plan, with conflicting revisions, gaps and material shortfalls listed. The owners decide; nothing is approved or released.

    Starts it
    Production planner
    Brings
    export, notes
    Gets
    5 outputs
    • Operations and process improvement (filtered by)
    • Hardware and physical technology (filtered by)
    • Established businesses
  • Production schedule rebuild

    When orders or forecasts change, the production planner gets a draft build schedule from open orders, work-centre capacity and material availability, with every overload and shortage listed, not quietly fixed. The planner checks feasibility and approves the changes.

    Starts it
    Production planner
    Brings
    export, notes
    Gets
    7 outputs
    • Operations and process improvement (filtered by)
    • Hardware and physical technology (filtered by)
    • Consumer brands
  • Quality management review pack

    Before the periodic quality review, the quality lead gets one brief for senior leaders: where each measure stands, complaints and defects, audit findings, action status, and the decisions still open. The leaders decide; the brief claims no compliance with any standard.

    Starts it
    Quality lead
    Brings
    export, notes
    Gets
    8 outputs