Workflows Directory

Find your team’s next superpower.

Results

10 workflow templates

  • Business insurance renewal review

    Before the business insurance renews, the owner gets one pack: every policy with insurer, limits, deductibles, premium and dates; renewal terms beside expiring ones, every change marked; what changed in the business; claims; and questions for the broker. The broker and the owner decide all cover.

    Starts it
    Owner
    Brings
    export, notes, document
    Gets
    8 outputs
    • Procurement and suppliers (filtered by)
    • Logistics and trade (filtered by)
    • Construction
  • Carrier performance review

    The shipping lead gets a lane-by-lane comparison of carriers from the delivery export and the freight charges: on-time delivery, damage, tracking gaps and cost, each with the shipments behind it. A person decides whether to raise issues or change carrier.

    Starts it
    Shipping lead
    Brings
    export, notes
    Gets
    5 outputs
  • Component end-of-life exposure brief

    When a supplier announces a component constraint or end-of-life date, the sourcing lead gets one brief: where the part is used, stock and demand set against the stated dates, and questions about replacements, with unverified availability kept apart from approved supply.

    Starts it
    Sourcing lead
    Brings
    export, notes, pasted text
    Gets
    5 outputs
  • Contractor safety prequalification

    For a named job, the operations, facilities or site manager gets a safety questionnaire scaled to the risk of the work, then a record of the contractor's answers scored only on the evidence supplied, with every gap, the conditions that close it and a review date. A competent person decides.

    Starts it
    Operations manager
    Brings
    export, notes, document
    Gets
    7 outputs
    • Procurement and suppliers (filtered by)
    • Logistics and trade (filtered by)
    • Construction
  • Inbound receiving exception trace

    When what arrived does not match the advance shipment notice, the receiving supervisor or inventory controller gets the notice, the packing list and the scans side by side by item and lot, with missing references and questions to investigate. Nothing is adjusted and nobody is contacted.

    Starts it
    Receiving supervisor
    Brings
    export, notes
    Gets
    5 outputs
  • Pilot build readiness brief

    Before a prototype or pilot build, the build lead gets one brief: part shortages, revision conflicts and open actions set against the team’s own build checklist, with allocated parts kept apart from received ones. People confirm; nothing is released.

    Starts it
    Build lead
    Brings
    export, notes, document
    Gets
    7 outputs
    • Project and delivery
    • Procurement and suppliers (filtered by)
    • Hardware and physical technology (filtered by)
  • RFQ clarification list

    A buyer sending drawings and specifications out for quotation gets one list of missing details, conflicting revisions and ambiguous tolerances, and a record of each supplier's answers. The buyer approves every message; the engineer settles every technical question.

    Starts it
    Buyer
    Brings
    export, notes, pasted text
    Gets
    6 outputs
    • Procurement and suppliers (filtered by)
    • Hardware and physical technology (filtered by)
    • Engineering firms
  • Supplier delivery date check

    The purchasing or operations person gets one comparison from the open purchase orders and the supplier replies: promised and revised dates side by side, the orders each change puts at risk, and the follow-ups still unanswered. No supplier is contacted.

    Starts it
    Buyer
    Brings
    export, notes
    Gets
    5 outputs
  • Supplier quality response check

    A quality or purchasing person who has raised a defect with a supplier gets the supplier's reply set against the finding: what is answered, what is not, the evidence still to ask for, the actions proposed and what has yet to be verified. The person decides whether the answer is accepted.

    Starts it
    Supplier-quality owner
    Brings
    export, notes, document, pasted text
    Gets
    7 outputs
    • Quality management
    • Procurement and suppliers (filtered by)
    • Hardware and physical technology (filtered by)
  • Vendor renewal review

    Before a supplier's notice date, the operations lead takes one page to the decision: the dates counted from the ones you supply, how much of what you pay for is used, what it has cost and what renewal would cost, how the supplier has performed, and the questions to ask. Nothing is sent or cancelled.

    Starts it
    Operations lead
    Brings
    export, notes
    Gets
    8 outputs