Workflows Directory
Find your team’s next superpower.
Results
26 workflow templates, showing 1 to 24
Asset register to invoice reconciliation
When new equipment, transfers or retirements must reach the reporting pack, the asset accountant gets a proposed register update matched to purchase records, commissioning evidence and the ledger, with duplicate IDs, unmatched invoices and uncertain in-service dates listed.
- Starts it
- Asset accountant
- Brings
- export, notes
- Gets
- 8 outputs
Asset replacement options comparison
When an aging asset has more than one proposed replacement or upgrade, the finance lead and the engineering owner get one workbook: the supplied costs, operating assumptions and lives on one basis, with price-basis gaps, unverified savings and open sensitivity questions marked. It recommends no spend.
- Starts it
- Finance analyst
- Brings
- export, notes
- Gets
- 6 outputs
Contractor safety prequalification
For a named job, the operations, facilities or site manager gets a safety questionnaire scaled to the risk of the work, then a record of the contractor's answers scored only on the evidence supplied, with every gap, the conditions that close it and a review date. A competent person decides.
- Starts it
- Operations manager
- Brings
- export, notes, document
- Gets
- 7 outputs
Design assumption change register
When client criteria or design assumptions change, the project engineer gets one sourced register: what changed, which recorded requirements it touches, how firm each source is, and what still needs confirmation. No design basis is altered.
- Starts it
- Project engineer
- Brings
- export, notes
- Gets
- 6 outputs
Emissions activity data schedule
When the reporting period closes, the environmental reporting owner gets one source-linked schedule of energy, fuel and transport quantities with units and the boundary supplied, estimates kept apart from measured activity, missing factor references and gaps listed. It calculates no emissions figure.
- Starts it
- Environmental reporting owner
- Brings
- export, notes
- Gets
- 5 outputs
Engineering change affected records index
When an engineering change request enters review, the document controller gets one index: the assemblies, revisions, stock and open purchase orders the change reaches in the exports supplied, and a question for each owner wherever the records are unclear.
- Starts it
- Document controller
- Brings
- export, notes
- Gets
- 3 outputs
Evaluation unit trial review
When a customer's evaluation reaches its review milestone, the account engineer and account owner get a trial-review agenda that sets the agreed use case beside the recorded results, setup changes and feedback, with every gap turned into a question and next-step options.
- Starts it
- Account engineer
- Brings
- export, notes
- Gets
- 4 outputs
Executive week-ahead calendar review
Before the week starts, the executive assistant hands the executive one brief: every clash, every journey or run of meetings with too little time, every meeting with no stated purpose or no preparation time, and proposed time for the week's priorities. Nothing is accepted, declined, moved or sent.
- Starts it
- Executive assistant
- Brings
- export, notes
- Gets
- 7 outputs
Field service invoice evidence check
When completed field work is ready for invoicing, the billing manager gets draft billing lines that tie the agreed rates to crew time, equipment use, mobilization and signed service tickets. Unsigned tickets, overlapping equipment days and unsupported extras are listed as exceptions.
- Starts it
- Billing manager
- Brings
- export, notes
- Gets
- 6 outputs
Inbox triage
The owner, or the assistant who keeps their inbox, starts the day knowing what needs a reply today, what can wait and until when, and what belongs to someone else, with a draft or a forwarding note for each. Nothing is sent, archived, deleted or moved, and no mailbox login is needed.
- Starts it
- Executive assistant
- Brings
- export, notes, pasted text
- Gets
- 6 outputs
Lender draw package index
Before a monthly draw goes to the lender, the project finance lead has an index in the lender’s own order: every required document listed or missing, and every invoice set against the ledger. The lender decides funding; nothing is submitted.
- Starts it
- Project accountant
- Brings
- export, notes
- Gets
- 5 outputs
Lone work arrangements review
For each task someone does alone, the manager gets the check-in method, the places where nobody could be reached, who responds when a check-in is missed and how soon, and alternatives. A competent person decides what is acceptable.
- Starts it
- Operations manager
- Brings
- export, notes
- Gets
- 6 outputs
Offtake statement variance check
When a buyer's offtake statement differs from the energy sales ledger, the settlement analyst gets one comparison: volumes, periods, prices and adjustments set against the metered-volume export and the agreed price inputs, each discrepancy traced to its source. Nothing is disputed or adjusted.
- Starts it
- Settlement analyst
- Brings
- export, notes
- Gets
- 6 outputs
Pay application line check
Before a progress billing goes on, the project accountant has every line compared with the schedule of values, the last certificate, the approved changes and the evidence supplied, with each arithmetic difference listed. The authorized certifier decides payment; nothing is certified.
- Starts it
- Project accountant
- Brings
- export, notes
- Gets
- 3 outputs
Preventive maintenance plan
For one site, the facilities or operations manager gets every piece of equipment ranked by failure cost, an approach for each (run to failure, scheduled or condition-based), a dated calendar of tasks from the maker's guidance and the failure history, the spare parts to hold and the downtime measures to track.
- Starts it
- Facilities manager
- Brings
- export, notes
- Gets
- 6 outputs
Property owner report
A property manager gets the month's owner report drafted from the statements and logs they supply: occupancy, collections, open maintenance and the decisions the owner is asked to make, each statement traced to its source and each gap shown.
- Starts it
- Property manager
- Brings
- export, notes, document
- Gets
- 6 outputs
Punch list consolidation
The site manager gets the punch list for the next closeout walk as one list grouped by location and trade, with repeated entries merged, photographs attached and a proposed follow-up date for each open item. Nothing is assigned, closed or accepted.
- Starts it
- Site manager
- Brings
- export, notes
- Gets
- 7 outputs
Recurring repair service history
When repeated maintenance keeps disturbing guests, the facilities manager gets one brief by equipment and room area: repeated work orders, confirmed service interruptions and missing inspection records side by side. It finds no cause and orders no work.
- Starts it
- Facilities manager
- Brings
- export, notes
- Gets
- 5 outputs
Service visit work packet
Before a planned visit to a turbine, inverter or terminal asset, the maintenance supervisor gets one packet built from the logs and approved scope supplied: reported symptoms, previous visits, open parts requests and access questions. It judges no condition and sends nothing.
- Starts it
- Maintenance supervisor
- Brings
- export, notes
- Gets
- 7 outputs
Spreadsheet check before sharing
Before a model or schedule goes to a client, a lender or a board, the sender gets one report on it: every error value, short total, buried assumption and hidden row pinned to its cell, each with a fix or a question, and a plain list of what was not checked. Nothing in the workbook is changed.
- Starts it
- Finance manager
- Brings
- export, notes
- Gets
- 5 outputs
Submittal register review
The project engineer gets one register of every required submittal: what has arrived, the review status as recorded, the documents still missing and the long-lead items at risk against the date each order must be placed. Nothing is routed, accepted or ordered.
- Starts it
- Project engineer
- Brings
- export, notes
- Gets
- 6 outputs
Temporary change register
For a site or operations manager with temporary changes to equipment, layout or process still in place: a register of every change with its expiry date, the checks still outstanding and the procedures and training it touches, ready for the competent person who decides what happens next.
- Starts it
- Site manager
- Brings
- export, notes
- Gets
- 7 outputs
Three-week look-ahead constraint review
Before the coordination meeting, the superintendent gets a brief that sets each planned activity of the next three weeks beside what could hold it up: trades sharing an area, unfinished predecessors, open approvals, late deliveries and unanswered RFIs. The superintendent confirms the sequence and assigns the follow-up.
- Starts it
- Project engineer
- Brings
- export, notes
- Gets
- 7 outputs
Unit turnover readiness checklist
Between one tenant and the next, the property manager gets one page for the unit: every recorded repair, the cleaning, keys, utilities and vendor confirmations still open against the approved move-in date, each gap written as a question. Nothing is sent.
- Starts it
- Property manager
- Brings
- export, notes
- Gets
- 5 outputs