Workflows Directory

Workflow templates for real estate

Results

20 workflow templates

  • Asset replacement options comparison

    When an aging asset has more than one proposed replacement or upgrade, the finance lead and the engineering owner get one workbook: the supplied costs, operating assumptions and lives on one basis, with price-basis gaps, unverified savings and open sensitivity questions marked. It recommends no spend.

    Starts it
    Finance analyst
    Brings
    export, notes
    Gets
    6 outputs
  • Contractor safety prequalification

    For a named job, the operations, facilities or site manager gets a safety questionnaire scaled to the risk of the work, then a record of the contractor's answers scored only on the evidence supplied, with every gap, the conditions that close it and a review date. A competent person decides.

    Starts it
    Operations manager
    Brings
    export, notes, document
    Gets
    7 outputs
  • Executive week-ahead calendar review

    Before the week starts, the executive assistant hands the executive one brief: every clash, every journey or run of meetings with too little time, every meeting with no stated purpose or no preparation time, and proposed time for the week's priorities. Nothing is accepted, declined, moved or sent.

    Starts it
    Executive assistant
    Brings
    export, notes
    Gets
    7 outputs
  • Inbox triage

    The owner, or the assistant who keeps their inbox, starts the day knowing what needs a reply today, what can wait and until when, and what belongs to someone else, with a draft or a forwarding note for each. Nothing is sent, archived, deleted or moved, and no mailbox login is needed.

    Starts it
    Executive assistant
    Brings
    export, notes, pasted text
    Gets
    6 outputs
  • Lender draw package index

    Before a monthly draw goes to the lender, the project finance lead has an index in the lender’s own order: every required document listed or missing, and every invoice set against the ledger. The lender decides funding; nothing is submitted.

    Starts it
    Project accountant
    Brings
    export, notes
    Gets
    5 outputs
  • Listing copy fact check

    The listing agent or marketing lead gets draft listing copy in which every statement is tied to the property sheet, a measurement or a photo, with unsupported descriptions marked and kept out. The listing broker approves; the designated reviewer checks advertising requirements.

    Starts it
    Listing agent
    Brings
    export, notes, document, pasted text
    Gets
    6 outputs
  • Lone work arrangements review

    For each task someone does alone, the manager gets the check-in method, the places where nobody could be reached, who responds when a check-in is missed and how soon, and alternatives. A competent person decides what is acceptable.

    Starts it
    Operations manager
    Brings
    export, notes
    Gets
    6 outputs
  • Pay application line check

    Before a progress billing goes on, the project accountant has every line compared with the schedule of values, the last certificate, the approved changes and the evidence supplied, with each arithmetic difference listed. The authorized certifier decides payment; nothing is certified.

    Starts it
    Project accountant
    Brings
    export, notes
    Gets
    3 outputs
  • Preventive maintenance plan

    For one site, the facilities or operations manager gets every piece of equipment ranked by failure cost, an approach for each (run to failure, scheduled or condition-based), a dated calendar of tasks from the maker's guidance and the failure history, the spare parts to hold and the downtime measures to track.

    Starts it
    Facilities manager
    Brings
    export, notes
    Gets
    6 outputs
  • Property diligence index

    The transaction lead gets a diligence room in order: every document indexed by workstream, every checklist item and request tracked, and every open finding tied to the report or request that raised it. Specialists judge the findings; nothing is valued or sent.

    Starts it
    Transaction coordinator
    Brings
    export, notes
    Gets
    5 outputs
  • Property owner report

    A property manager gets the month's owner report drafted from the statements and logs they supply: occupancy, collections, open maintenance and the decisions the owner is asked to make, each statement traced to its source and each gap shown.

    Starts it
    Property manager
    Brings
    export, notes, document
    Gets
    6 outputs
  • Punch list consolidation

    The site manager gets the punch list for the next closeout walk as one list grouped by location and trade, with repeated entries merged, photographs attached and a proposed follow-up date for each open item. Nothing is assigned, closed or accepted.

    Starts it
    Site manager
    Brings
    export, notes
    Gets
    7 outputs
  • Recurring repair service history

    When repeated maintenance keeps disturbing guests, the facilities manager gets one brief by equipment and room area: repeated work orders, confirmed service interruptions and missing inspection records side by side. It finds no cause and orders no work.

    Starts it
    Facilities manager
    Brings
    export, notes
    Gets
    5 outputs
  • Rent roll to lease abstract match

    Your property accountant gets the rent roll checked against the verified lease abstracts and amendments, unit by unit: rent, area, commencement and expiration, with every difference listed for review. It compares supplied fields only and corrects nothing.

    Starts it
    Property accountant
    Brings
    export, notes, document
    Gets
    6 outputs
  • Spreadsheet check before sharing

    Before a model or schedule goes to a client, a lender or a board, the sender gets one report on it: every error value, short total, buried assumption and hidden row pinned to its cell, each with a fix or a question, and a plain list of what was not checked. Nothing in the workbook is changed.

    Starts it
    Finance manager
    Brings
    export, notes
    Gets
    5 outputs
  • Submittal register review

    The project engineer gets one register of every required submittal: what has arrived, the review status as recorded, the documents still missing and the long-lead items at risk against the date each order must be placed. Nothing is routed, accepted or ordered.

    Starts it
    Project engineer
    Brings
    export, notes
    Gets
    6 outputs
  • Three-week look-ahead constraint review

    Before the coordination meeting, the superintendent gets a brief that sets each planned activity of the next three weeks beside what could hold it up: trades sharing an area, unfinished predecessors, open approvals, late deliveries and unanswered RFIs. The superintendent confirms the sequence and assigns the follow-up.

    Starts it
    Project engineer
    Brings
    export, notes
    Gets
    7 outputs
  • Unit turnover readiness checklist

    Between one tenant and the next, the property manager gets one page for the unit: every recorded repair, the cleaning, keys, utilities and vendor confirmations still open against the approved move-in date, each gap written as a question. Nothing is sent.

    Starts it
    Property manager
    Brings
    export, notes
    Gets
    5 outputs
  • Vendor insurance certificate check

    For a property manager collecting insurance certificates from service vendors: each certificate's fields set beside the requirements the team already approved, every stated expiration date listed, and draft requests for what is missing. The manager reviews gaps with the insurance adviser before accepting anything.

    Starts it
    Property manager
    Brings
    export, notes, document, pasted text
    Gets
    9 outputs
  • Website findability audit

    An owner or marketer asking why the website is not found gets a plain report from saved copies of their own pages: what stops each page being reached, read or understood, the fixes in order, and the checks only a live look can settle. No ranking is promised.

    Starts it
    Owner
    Brings
    notes, document
    Gets
    7 outputs