Capabilities directory
Find your team’s next superpower.
- Function: Analytics and reporting
- Function: Project and delivery
- Function: Recruiting and hiring
- Industry: Construction
- Industry: Manufacturing
- Clear all filters
Results
18 capabilities
Budget-versus-actual variance commentary
Before the month's results go to management, the finance lead gets written commentary on every line that moved past the threshold: the figures, the budget owner's explanation marked confirmed or to be confirmed, a bridge from budget to actual, and the questions still open. No cause is invented.
Employee onboarding plan
Every new colleague starts with a first week and a first 90 days planned to the standard of your best manager: what to read, who to meet, what to practice and what productive means at day 30, 60 and 90.
Hiring pipeline status report
Each week your people lead or founder sees every open role on one page: applications at each stage, days open against the target, roles running late, pass-through between stages, which sources lead to interviews, and every blocker with its owner. It counts; it never assesses a candidate.
Job description
A hiring manager’s rough notes become a job description the right people want to answer: why the role exists, the work itself, and only the must-haves that are real. Your approved pay and employer wording go in untouched, and nothing is posted until the hiring manager and the people lead approve it.
Job posting and sourcing plan
For one approved role, the hiring manager gets a plan for where to post and where to look: every channel on the company's own list ordered by the signal it should give for that kind of role, a week-by-week schedule inside the budget, and what to count on each channel. Nothing is posted or paid until a person approves.
Meeting agenda, notes and follow-ups
Whoever runs the meeting walks in with an agenda where every topic has an outcome and a time, and walks out with a one-page record: what was decided, who owns each action and by when, and what is still open. Nothing reaches anyone until that person has read it and sends it.
Operations KPI scorecard
Once a month the operations manager gets one red-amber-green page for the ten or fewer measures that run the operation: each value worked out from your own exports, its trend, what moved and why in the owner's words, and the action agreed for every red. You set the measures and decide the actions.
Premortem before a decision
Before your team commits to a plan that is hard to undo, such as a move, a launch or a new system, a short workshop pictures it a few months on, already failed. The record ranks the reasons, turns each top risk into a check, a warning sign and an owner, and leaves the go decision with the owner.
Project handover readiness check
When a finished deliverable is ready for the team that will run it, the project manager brings one checklist against that team's own requirements: acceptance evidence, instructions, access, training, support owners and open items. The receiving owner accepts or names the conditions still to meet.
Project lessons review
When a phase or a project ends, the project manager gets one blameless review: whether it achieved what it was for, how scope, schedule and budget moved and why, whether the success measures were the right ones, and practice changes for the team to choose, each with an owner and a follow-up date.
Project scope baseline
A project manager turns an approved brief into a draft scope baseline: the deliverables, what is excluded, the acceptance criteria for each deliverable, the constraints and the open questions for the sponsor. Nothing implied counts as scope until the sponsor says so.
Project status report
The lead of an internal project gets a status report the sponsor can read in two minutes: each workstream red, amber or green with the reason, what moved, who must clear each blocker, the decisions needed and the dates at risk. No milestone is called done without evidence, and the lead confirms every status.
Sales pipeline review
Each week your sales lead sees the whole open pipeline on one page: value and age by stage, what moved since last week, the deals at risk and coverage against your target. Every figure traces to your export, and the forecast number is left for a person to commit.
Schedule recovery options
When a committed milestone slips, the project manager brings the sponsor two to four ways back: what each changes, the dates it gives every later milestone and dependency, and the assumptions it rests on. The sponsor chooses; delivery leads confirm the dates.
Scope change impact review
When new work turns up in a project plan, the project manager gets one review: every deliverable compared with the agreed baseline, each addition marked approved or not, its estimated effect on effort, cost and the end date, and the decision the sponsor has to make. The sponsor accepts or declines each one.
Stakeholder and decision rights map
Before kickoff, the project manager holds one map of everyone the project touches: each group placed by influence and interest, every key decision with exactly one accountable owner, the decision makers still missing, and who hears what, when and from whom. The sponsor confirms every decision right.
Website findability audit
An owner or marketer asking why the website is not found gets a plain report from saved copies of their own pages: what stops each page being reached, read or understood, the fixes in order, and the checks only a live look can settle. No ranking is promised.
Win-loss review
Once a quarter your sales lead sees, from the deals you closed, where the losses ended, which kinds of deal you win and lose, what the largest deals show, and which findings rest on enough deals to act on. Actions are proposed in proportion to the evidence, and nothing in your sales system is changed.