Capabilities directory

Find your team’s next superpower.

Results

12 capabilities

  • Asset replacement options comparison

    When an aging asset has more than one proposed replacement or upgrade, the finance lead and the engineering owner get one workbook: the supplied costs, operating assumptions and lives on one basis, with price-basis gaps, unverified savings and open sensitivity questions marked. It recommends no spend.

    • Finance and accounting (filtered by)
    • Real estate (filtered by)
    • Energy
  • Contractor safety prequalification

    For a named job, the operations, facilities or site manager gets a safety questionnaire scaled to the risk of the work, then a record of the contractor's answers scored only on the evidence supplied, with every gap, the conditions that close it and a review date. A competent person decides.

    • Procurement and suppliers (filtered by)
    • Real estate (filtered by)
    • Construction
  • Executive week-ahead calendar review

    Before the week starts, the executive assistant hands the executive one brief: every clash, every journey or run of meetings with too little time, every meeting with no stated purpose or no preparation time, and proposed time for the week's priorities. Nothing is accepted, declined, moved or sent.

  • Inbox triage

    The owner, or the assistant who keeps their inbox, starts the day knowing what needs a reply today, what can wait and until when, and what belongs to someone else, with a draft or a forwarding note for each. Nothing is sent, archived, deleted or moved, and no mailbox login is needed.

  • Lender draw package index

    Before a monthly draw goes to the lender, the project finance lead has an index in the lender’s own order: every required document listed or missing, and every invoice set against the ledger. The lender decides funding; nothing is submitted.

    • Finance and accounting (filtered by)
    • Real estate (filtered by)
    • Construction
  • Pay application line check

    Before a progress billing goes on, the project accountant has every line compared with the schedule of values, the last certificate, the approved changes and the evidence supplied, with each arithmetic difference listed. The authorized certifier decides payment; nothing is certified.

    • Finance and accounting (filtered by)
    • Real estate (filtered by)
    • Construction
  • Property owner report

    A property manager gets the month's owner report drafted from the statements and logs they supply: occupancy, collections, open maintenance and the decisions the owner is asked to make, each statement traced to its source and each gap shown.

  • Rent roll to lease abstract match

    Your property accountant gets the rent roll checked against the verified lease abstracts and amendments, unit by unit: rent, area, commencement and expiration, with every difference listed for review. It compares supplied fields only and corrects nothing.

  • Spreadsheet check before sharing

    Before a model or schedule goes to a client, a lender or a board, the sender gets one report on it: every error value, short total, buried assumption and hidden row pinned to its cell, each with a fix or a question, and a plain list of what was not checked. Nothing in the workbook is changed.

  • Submittal register review

    The project engineer gets one register of every required submittal: what has arrived, the review status as recorded, the documents still missing and the long-lead items at risk against the date each order must be placed. Nothing is routed, accepted or ordered.

  • Three-week look-ahead constraint review

    Before the coordination meeting, the superintendent gets a brief that sets each planned activity of the next three weeks beside what could hold it up: trades sharing an area, unfinished predecessors, open approvals, late deliveries and unanswered RFIs. The superintendent confirms the sequence and assigns the follow-up.

  • Vendor insurance certificate check

    For a property manager collecting insurance certificates from service vendors: each certificate's fields set beside the requirements the team already approved, every stated expiration date listed, and draft requests for what is missing. The manager reviews gaps with the insurance adviser before accepting anything.

    • Procurement and suppliers (filtered by)
    • Real estate (filtered by)
    • Construction