Capabilities directory

Find your team’s next superpower.

Results

16 capabilities

  • Asset register to invoice reconciliation

    When new equipment, transfers or retirements must reach the reporting pack, the asset accountant gets a proposed register update matched to purchase records, commissioning evidence and the ledger, with duplicate IDs, unmatched invoices and uncertain in-service dates listed.

    • Finance and accounting (filtered by)
    • Energy (filtered by)
    • Construction
  • Asset replacement options comparison

    When an aging asset has more than one proposed replacement or upgrade, the finance lead and the engineering owner get one workbook: the supplied costs, operating assumptions and lives on one basis, with price-basis gaps, unverified savings and open sensitivity questions marked. It recommends no spend.

    • Finance and accounting (filtered by)
    • Energy (filtered by)
    • Real estate (filtered by)
  • Engagement margin review

    Midway or at close, the partner and finance lead get one worksheet for an engagement: recorded time, agreed fee, billed to date and supplied costs by workstream, the gaps that limit it, and the questions the team must answer. No cost rate is invented.

  • Estimate basis pack

    An estimator pricing a job from drawings, takeoffs and supplier quotes gets one worksheet: every figure with its quantity source, rate source and date beside it, each exclusion listed and every gap already written as a scope question. The estimator verifies; the bid lead decides the figure.

    • Finance and accounting (filtered by)
    • Engineering firms (filtered by)
    • Construction
  • Field service invoice evidence check

    When completed field work is ready for invoicing, the billing manager gets draft billing lines that tie the agreed rates to crew time, equipment use, mobilization and signed service tickets. Unsigned tickets, overlapping equipment days and unsupported extras are listed as exceptions.

    • Finance and accounting (filtered by)
    • Energy (filtered by)
    • Construction
  • Lender draw package index

    Before a monthly draw goes to the lender, the project finance lead has an index in the lender’s own order: every required document listed or missing, and every invoice set against the ledger. The lender decides funding; nothing is submitted.

    • Finance and accounting (filtered by)
    • Real estate (filtered by)
    • Construction
  • Matter closing checklist preparation

    When the handling lawyer flags a matter for closure, the firm's closing checklist is filled from the matter record: final billing as recorded, open tasks, unreturned items and the handoffs billing and records must accept.

  • Matter-opening checklist preparation

    Every accepted matter goes into setup and billing with one checklist: the fields each system needs, the terms that drive the first invoice, the documents on file and an owner for every open item.

  • Month-end close checklist

    Before the month ends, your controller holds the whole close on one page: every task with its owner, its date and what it waits on, the chain that sets the close date, and each gap already written as a question. Entries are prepared for approval, never posted.

  • Offtake statement variance check

    When a buyer's offtake statement differs from the energy sales ledger, the settlement analyst gets one comparison: volumes, periods, prices and adjustments set against the metered-volume export and the agreed price inputs, each discrepancy traced to its source. Nothing is disputed or adjusted.

  • Pay application line check

    Before a progress billing goes on, the project accountant has every line compared with the schedule of values, the last certificate, the approved changes and the evidence supplied, with each arithmetic difference listed. The authorized certifier decides payment; nothing is certified.

    • Finance and accounting (filtered by)
    • Real estate (filtered by)
    • Construction
  • Property owner report

    A property manager gets the month's owner report drafted from the statements and logs they supply: occupancy, collections, open maintenance and the decisions the owner is asked to make, each statement traced to its source and each gap shown.

  • Receivables exception review

    The controller gets every short payment, unmatched or ambiguous receipt, possible duplicate and disputed invoice on one list, each with its evidence and a proposed next step, before anything is applied on a guess.

  • Rent roll to lease abstract match

    Your property accountant gets the rent roll checked against the verified lease abstracts and amendments, unit by unit: rent, area, commencement and expiration, with every difference listed for review. It compares supplied fields only and corrects nothing.

  • Spreadsheet check before sharing

    Before a model or schedule goes to a client, a lender or a board, the sender gets one report on it: every error value, short total, buried assumption and hidden row pinned to its cell, each with a fix or a question, and a plain list of what was not checked. Nothing in the workbook is changed.

  • Weekly receivables summary

    The finance lead takes one page into each week’s management meeting: what came in, where every receivable stands, which exceptions are open and who owns them, and the decisions management must make. Every figure ties to the aging report.

    • Finance and accounting (filtered by)
    • Engineering firms (filtered by)
    • Growth & scaling