Capabilities directory

Find your team’s next superpower.

Results

36 capabilities, showing 1 to 24

  • Acceptance criteria sheet

    Hand a developer or agency a story with its definition of done written down: testable expected behaviours, error cases and edge cases, each traced to a rule or design state, with the unclear terms and open questions listed for the product owner.

  • Assumption map

    For a product owner whose plan rests on beliefs nobody has tested: each belief is written down, set against the evidence you hold, ranked by what it would do to the plan, and given a cheap test to choose from. You decide what to test; no evidence is invented.

  • Business model assumptions review

    Before you commit money to a new or revised business model, see it block by block with every claim marked evidenced or assumed, the riskiest assumptions ranked, and the cheapest test for each. You choose what to test; no projection or valuation is made.

  • Client-status update preparation

    Every client gets an accurate status update on schedule, drafted from the notes and the task list, with confirmed dates kept apart from estimates and the client’s open decisions in plain view.

  • Contractor safety prequalification

    For a named job, the operations, facilities or site manager gets a safety questionnaire scaled to the risk of the work, then a record of the contractor's answers scored only on the evidence supplied, with every gap, the conditions that close it and a review date. A competent person decides.

  • Customer feedback themes

    Each month your support lead sees what customers keep telling you: tickets, disputes, reviews and survey comments grouped into themes with counts and quotations, the three issues most worth fixing with a proposed fix and owner, and a note for customers once a fix ships. A person decides every fix.

  • Customer interview synthesis

    Turn a stack of customer call notes into the answer to one question, in your customers’ own words. Every quotation is cited to the note it came from, every theme shows its confidence and the evidence against it, and nothing is claimed that the notes do not say.

  • Emergency drill brief

    Before a fire, evacuation or other drill, the site or office manager gets one brief: the scenario the responsible person has approved, who does what, what each observer records, and the questions for the debrief. It writes no emergency plan.

  • Ergonomic review inputs

    For a supervisor preparing for an ergonomics assessor or a worker's complaint about a task: a task observation record of each step's movements, durations, loads and measurements as supplied, the measurements still missing, and what the people who do the task said.

  • Feedback follow-through updates

    When a change ships or a decision lands on something customers asked for, your account owner gets the list of who asked, the confirmed status of each request, and an individual draft update for each person in the channel they prefer. No update promises a date or feature the team has not confirmed.

  • Incident investigation and corrective actions

    After an injury, near miss or property damage, the site, operations or safety manager gets the investigation written up from the evidence: a timeline, the immediate and underlying causes, actions with owners and dates, and a register that follows each action until a check shows it worked.

  • Launch checklist

    Whoever owns a launch date gets one dated checklist for the weeks before, the day itself and the weeks after, with an owner on every line. Each announcement is written out so the approver sees exactly what goes out, to whom and from where before saying go. Nothing is announced by the assistant.

  • Lone work arrangements review

    For each task someone does alone, the manager gets the check-in method, the places where nobody could be reached, who responds when a check-in is missed and how soon, and alternatives. A competent person decides what is acceptable.

  • Matter budget and status summary

    The responsible partner sees one matter whole: scope, phases against their dates, the budget against fees to date and the projected total, a red, amber or green status with the rule behind it, risks and next actions with owners. Built from the time export and the matter plan, never a view on the merits.

  • Meeting agenda, notes and follow-ups

    Whoever runs the meeting walks in with an agenda where every topic has an outcome and a time, and walks out with a one-page record: what was decided, who owns each action and by when, and what is still open. Nothing reaches anyone until that person has read it and sends it.

  • Premortem before a decision

    Before your team commits to a plan that is hard to undo, such as a move, a launch or a new system, a short workshop pictures it a few months on, already failed. The record ranks the reasons, turns each top risk into a check, a warning sign and an owner, and leaves the go decision with the owner.

  • Preventive maintenance plan

    For one site, the facilities or operations manager gets every piece of equipment ranked by failure cost, an approach for each (run to failure, scheduled or condition-based), a dated calendar of tasks from the maker's guidance and the failure history, the spare parts to hold and the downtime measures to track.

  • Product pricing options

    A product owner weighing how to price or package a product gets one options brief: what each customer group uses, the willingness-to-pay evidence held with stated kept apart from observed, what each option would bill every account, the uncertainties and the tests. It recommends no price.

  • Project handover readiness check

    When a finished deliverable is ready for the team that will run it, the project manager brings one checklist against that team's own requirements: acceptance evidence, instructions, access, training, support owners and open items. The receiving owner accepts or names the conditions still to meet.

  • Project intake and capacity review

    When a new initiative is proposed, the portfolio owner sees it scored on the business's own criteria beside the projects already committed, the delivery days it would use month by month, and what it would crowd out or push later. The owner accepts, defers or rejects it.

  • Project lessons review

    When a phase or a project ends, the project manager gets one blameless review: whether it achieved what it was for, how scope, schedule and budget moved and why, whether the success measures were the right ones, and practice changes for the team to choose, each with an owner and a follow-up date.

  • Project scope baseline

    A project manager turns an approved brief into a draft scope baseline: the deliverables, what is excluded, the acceptance criteria for each deliverable, the constraints and the open questions for the sponsor. Nothing implied counts as scope until the sponsor says so.

  • Project status report

    The lead of an internal project gets a status report the sponsor can read in two minutes: each workstream red, amber or green with the reason, what moved, who must clear each blocker, the decisions needed and the dates at risk. No milestone is called done without evidence, and the lead confirms every status.

  • Release notes draft

    The product owner gets draft release notes for one shipped release, in words users recognize: what is new, changed, removed and fixed, the steps users must take, and the known limitations. Only what was supplied is described. The owner checks and publishes.