Capabilities directory
Find your team’s next superpower.
- Function: Health, safety and environment
- Function: Project and delivery
- Function: Sales
- Industry: Construction
- Industry: Manufacturing
- Clear all filters
Results
32 capabilities, showing 1 to 24
Bid or no-bid and RFP response plan
Before anyone starts on a response, your bid manager sees every requirement in the request checked against your own evidence, your bid criteria tested and the buyer questions ready. A named person decides whether to bid; then a dated plan says who does what by when.
Business trip plan
The assistant hands the traveller one plan for one business trip: dates and nights fixed from the brief, travel and hotel options with prices and the day each was checked, a day-by-day timetable around the meetings, the cost against travel policy and the bookings still to make. Nothing is booked or paid.
Channel partner fit review
When a referral, reseller or alliance partner approaches, the founder or head of partnerships gets one review: evidence the partner brings customers of its own, the type that evidence supports, a ninety-day plan with signs to go on or stop, and the commission range that still beats selling direct. A person decides.
Contractor safety prequalification
For a named job, the operations, facilities or site manager gets a safety questionnaire scaled to the risk of the work, then a record of the contractor's answers scored only on the evidence supplied, with every gap, the conditions that close it and a review date. A competent person decides.
Deal close plan
Your account executive holds one late-stage deal on two pages: the buyer's case for buying now, counted from the buyer's own figures, and a dated plan of every step to signature with its owner on each side. The seller decides what the buyer sees; nothing reaches the sales system without approval.
Discount request review
Before a price below list goes to a customer, whoever approves it gets one page: the discount and what it costs in margin, every clause of your own written policy met or missed, who approves and in what order, and what the customer gives in return. A person decides; nothing is sent.
Emergency drill brief
Before a fire, evacuation or other drill, the site or office manager gets one brief: the scenario the responsible person has approved, who does what, what each observer records, and the questions for the debrief. It writes no emergency plan.
Ergonomic review inputs
For a supervisor preparing for an ergonomics assessor or a worker's complaint about a task: a task observation record of each step's movements, durations, loads and measurements as supplied, the measurements still missing, and what the people who do the task said.
Incident investigation and corrective actions
After an injury, near miss or property damage, the site, operations or safety manager gets the investigation written up from the evidence: a timeline, the immediate and underlying causes, actions with owners and dates, and a register that follows each action until a check shows it worked.
Lapsed-customer win-back
Once a month, the owner or account manager sees which regular customers have gone far longer than usual without ordering, ranked by what each bought in their last active year, with open complaints set aside for a call and a short note drafted for the rest, using only approved offers. A person approves every note.
Lone work arrangements review
For each task someone does alone, the manager gets the check-in method, the places where nobody could be reached, who responds when a check-in is missed and how soon, and alternatives. A competent person decides what is acceptable.
Meeting agenda, notes and follow-ups
Whoever runs the meeting walks in with an agenda where every topic has an outcome and a time, and walks out with a one-page record: what was decided, who owns each action and by when, and what is still open. Nothing reaches anyone until that person has read it and sends it.
Objection answers and sales one-pager
Walk into the call with an answer for every objection you expect, each with its honest limit and the proof behind it, and one page to leave behind. Everything is built from the facts you supply, so nothing on the page is a claim you cannot stand behind.
Premortem before a decision
Before your team commits to a plan that is hard to undo, such as a move, a launch or a new system, a short workshop pictures it a few months on, already failed. The record ranks the reasons, turns each top risk into a check, a warning sign and an owner, and leaves the go decision with the owner.
Preventive maintenance plan
For one site, the facilities or operations manager gets every piece of equipment ranked by failure cost, an approach for each (run to failure, scheduled or condition-based), a dated calendar of tasks from the maker's guidance and the failure history, the spare parts to hold and the downtime measures to track.
Price change review
Before prices change, the owner or finance lead gets one review: the margin on each product or service from the sales and cost exports, how costs have moved, what each proposed price does to sales and gross profit across a stated range of customer responses, and dated competitor prices. It recommends no price.
Project handover readiness check
When a finished deliverable is ready for the team that will run it, the project manager brings one checklist against that team's own requirements: acceptance evidence, instructions, access, training, support owners and open items. The receiving owner accepts or names the conditions still to meet.
Project lessons review
When a phase or a project ends, the project manager gets one blameless review: whether it achieved what it was for, how scope, schedule and budget moved and why, whether the success measures were the right ones, and practice changes for the team to choose, each with an owner and a follow-up date.
Project scope baseline
A project manager turns an approved brief into a draft scope baseline: the deliverables, what is excluded, the acceptance criteria for each deliverable, the constraints and the open questions for the sponsor. Nothing implied counts as scope until the sponsor says so.
Project status report
The lead of an internal project gets a status report the sponsor can read in two minutes: each workstream red, amber or green with the reason, what moved, who must clear each blocker, the decisions needed and the dates at risk. No milestone is called done without evidence, and the lead confirms every status.
Repeat incident pattern review
A safety lead with a year of incident records and earlier actions gets them compared in groups: confirmed causes, what was done before, and where incidents recur, with questions for the team. A competent person judges what the pattern means.
Safety walk follow-up
After a safety walk, the manager gets a follow-up brief that ties each concern workers raised to the commitment the manager made, its owner and due date, and the message to give back. Gaps arrive as questions, never as guesses.
Sales pipeline review
Each week your sales lead sees the whole open pipeline on one page: value and age by stage, what moved since last week, the deals at risk and coverage against your target. Every figure traces to your export, and the forecast number is left for a person to commit.
Schedule recovery options
When a committed milestone slips, the project manager brings the sponsor two to four ways back: what each changes, the dates it gives every later milestone and dependency, and the assumptions it rests on. The sponsor chooses; delivery leads confirm the dates.