Capabilities directory

Find your team’s next superpower.

Results

13 capabilities

  • Event plan

    Whoever owns one event, a talk, a dinner, a webinar or a stand, gets one plan: the goal and target, who should be in the room, every step before, on and after the day with a date and an owner, and how each conversation is followed up. Nothing is booked, paid or sent by the assistant.

  • Meeting agenda, notes and follow-ups

    Whoever runs the meeting walks in with an agenda where every topic has an outcome and a time, and walks out with a one-page record: what was decided, who owns each action and by when, and what is still open. Nothing reaches anyone until that person has read it and sends it.

  • Premortem before a decision

    Before your team commits to a plan that is hard to undo, such as a move, a launch or a new system, a short workshop pictures it a few months on, already failed. The record ranks the reasons, turns each top risk into a check, a warning sign and an owner, and leaves the go decision with the owner.

  • Press pitch preparation

    An owner or marketer with one story to offer gets the outlets and writers it genuinely fits, each backed by a piece they recently published, and a short pitch draft for each. Every claim in a draft comes from facts you supply. Drafts only: a person decides and sends.

    • Marketing and content (filtered by)
    • Hospitality (filtered by)
    • Consumer brands
  • Project handover readiness check

    When a finished deliverable is ready for the team that will run it, the project manager brings one checklist against that team's own requirements: acceptance evidence, instructions, access, training, support owners and open items. The receiving owner accepts or names the conditions still to meet.

  • Project lessons review

    When a phase or a project ends, the project manager gets one blameless review: whether it achieved what it was for, how scope, schedule and budget moved and why, whether the success measures were the right ones, and practice changes for the team to choose, each with an owner and a follow-up date.

  • Project scope baseline

    A project manager turns an approved brief into a draft scope baseline: the deliverables, what is excluded, the acceptance criteria for each deliverable, the constraints and the open questions for the sponsor. Nothing implied counts as scope until the sponsor says so.

  • Project status report

    The lead of an internal project gets a status report the sponsor can read in two minutes: each workstream red, amber or green with the reason, what moved, who must clear each blocker, the decisions needed and the dates at risk. No milestone is called done without evidence, and the lead confirms every status.

  • Reviewer comments into one resolution list

    The owner of a document that came back from several reviewers gets one checklist: every proposed edit and comment, grouped by section, with clashes between reviewers set side by side. Every item stays open until the owner decides it, and the document itself is never touched.

  • Schedule recovery options

    When a committed milestone slips, the project manager brings the sponsor two to four ways back: what each changes, the dates it gives every later milestone and dependency, and the assumptions it rests on. The sponsor chooses; delivery leads confirm the dates.

  • Scope change impact review

    When new work turns up in a project plan, the project manager gets one review: every deliverable compared with the agreed baseline, each addition marked approved or not, its estimated effect on effort, cost and the end date, and the decision the sponsor has to make. The sponsor accepts or declines each one.

  • Stakeholder and decision rights map

    Before kickoff, the project manager holds one map of everyone the project touches: each group placed by influence and interest, every key decision with exactly one accountable owner, the decision makers still missing, and who hears what, when and from whom. The sponsor confirms every decision right.

  • Website findability audit

    An owner or marketer asking why the website is not found gets a plain report from saved copies of their own pages: what stops each page being reached, read or understood, the fixes in order, and the checks only a live look can settle. No ranking is promised.

    • Marketing and content (filtered by)
    • Construction (filtered by)
    • Hospitality (filtered by)