Capabilities directory

Find your team’s next superpower.

Results

7 capabilities

  • Culture health check

    A founder or people lead sees whether the company's stated values show up in daily work: each value written as behaviours you could watch for, read against the team's own evidence, with where practice matches, where it drifts, and two or three rituals to try. Reported by team and theme, never about a person.

  • Departing-employee knowledge capture

    When someone is leaving or changing role, their manager gets an interview guide aimed at what only that person knows, then a handover document the successor can work from, every point traced to the conversations and marked with how sure it is. Nothing is shared until the manager approves.

  • Estimate basis pack

    An estimator pricing a job from drawings, takeoffs and supplier quotes gets one worksheet: every figure with its quantity source, rate source and date beside it, each exclusion listed and every gap already written as a scope question. The estimator verifies; the bid lead decides the figure.

  • RFQ clarification list

    A buyer sending drawings and specifications out for quotation gets one list of missing details, conflicting revisions and ambiguous tolerances, and a record of each supplier's answers. The buyer approves every message; the engineer settles every technical question.

  • Staff newsletter and FAQ roundup

    Each month the office manager turns what teams send in into one staff newsletter, with answers to the questions people keep asking, each quoted from an approved source and its owner named. Nothing about one person's pay, health or performance goes in, and a person approves the issue before it goes.

  • Submittal register review

    The project engineer gets one register of every required submittal: what has arrived, the review status as recorded, the documents still missing and the long-lead items at risk against the date each order must be placed. Nothing is routed, accepted or ordered.

  • Three-week look-ahead constraint review

    Before the coordination meeting, the superintendent gets a brief that sets each planned activity of the next three weeks beside what could hold it up: trades sharing an area, unfinished predecessors, open approvals, late deliveries and unanswered RFIs. The superintendent confirms the sequence and assigns the follow-up.