Capabilities directory
Find your team’s next superpower.
- Function: Procurement and suppliers
- Function: Project and delivery
- Function: Recruiting and hiring
- Clear all filters
Results
41 capabilities, showing 1 to 24
Bid or no-bid and RFP response plan
Before anyone starts on a response, your bid manager sees every requirement in the request checked against your own evidence, your bid criteria tested and the buyer questions ready. A named person decides whether to bid; then a dated plan says who does what by when.
Business insurance renewal review
Before the business insurance renews, the owner gets one pack: every policy with insurer, limits, deductibles, premium and dates; renewal terms beside expiring ones, every change marked; what changed in the business; claims; and questions for the broker. The broker and the owner decide all cover.
Candidate outreach drafting
For each person a recruiter or founder has already chosen to approach about an approved role: a first message and two follow-ups, each personal line traced to a public work source the recruiter supplied, do-not-contact names and opt-outs honoured, and a reply log. The recruiter sends every message.
Carrier performance review
The shipping lead gets a lane-by-lane comparison of carriers from the delivery export and the freight charges: on-time delivery, damage, tracking gaps and cost, each with the shipments behind it. A person decides whether to raise issues or change carrier.
Category sourcing plan
For the buyer or operations lead who owns one spend category, such as packaging or IT hardware: its spend and suppliers on one page, where it sits on a supply-risk and spend matrix, the value levers the evidence supports, and a dated sourcing plan. A person chooses the approach.
Client-status update preparation
Every client gets an accurate status update on schedule, drafted from the notes and the task list, with confirmed dates kept apart from estimates and the client’s open decisions in plain view.
Contractor safety prequalification
For a named job, the operations, facilities or site manager gets a safety questionnaire scaled to the risk of the work, then a record of the contractor's answers scored only on the evidence supplied, with every gap, the conditions that close it and a review date. A competent person decides.
Dental lab case tracker
The office coordinator keeps one tracker of every case at an outside dental lab: when it went, the lab's due date against the patient's seating, which cases are overdue or due back too late, each remake with its stated reason, and each lab's on-time record for the quarter. A person calls every lab.
Employee onboarding plan
Every new colleague starts with a first week and a first 90 days planned to the standard of your best manager: what to read, who to meet, what to practice and what productive means at day 30, 60 and 90.
Hiring pipeline status report
Each week your people lead or founder sees every open role on one page: applications at each stage, days open against the target, roles running late, pass-through between stages, which sources lead to interviews, and every blocker with its owner. It counts; it never assesses a candidate.
Interview plan and scorecard
Before the first interview, the hiring manager and every interviewer share one plan: the criteria the role needs, the same questions in the same order for every candidate, and a blank scorecard each person fills in alone. It rates no one. People make every decision about a candidate.
Interview process review after a hiring round
After a hiring round closes, the recruiting lead gets a review of the interview process: questions that gave no usable evidence, competencies nobody covered, inconsistent rubric use, and revisions to approve before the next search. It reviews the process only; no candidate is assessed.
Interview scheduling and candidate confirmation
For candidates your team has already chosen to interview, the recruiting coordinator gets one scheduling sheet that lines up each candidate's offered times, in their own time zone, with the interviewers' free time, plus a ready confirmation or availability request for each. A person sends every message and invitation.
Job description
A hiring manager’s rough notes become a job description the right people want to answer: why the role exists, the work itself, and only the must-haves that are real. Your approved pay and employer wording go in untouched, and nothing is posted until the hiring manager and the people lead approve it.
Job posting and sourcing plan
For one approved role, the hiring manager gets a plan for where to post and where to look: every channel on the company's own list ordered by the signal it should give for that kind of role, a week-by-week schedule inside the budget, and what to count on each channel. Nothing is posted or paid until a person approves.
Launch checklist
Whoever owns a launch date gets one dated checklist for the weeks before, the day itself and the weeks after, with an owner on every line. Each announcement is written out so the approver sees exactly what goes out, to whom and from where before saying go. Nothing is announced by the assistant.
Matter budget and status summary
The responsible partner sees one matter whole: scope, phases against their dates, the budget against fees to date and the projected total, a red, amber or green status with the rule behind it, risks and next actions with owners. Built from the time export and the matter plan, never a view on the merits.
Meeting agenda, notes and follow-ups
Whoever runs the meeting walks in with an agenda where every topic has an outcome and a time, and walks out with a one-page record: what was decided, who owns each action and by when, and what is still open. Nothing reaches anyone until that person has read it and sends it.
Order size comparison
When a supplier offers a bigger discounted order, the inventory planner gets each quantity costed the same way: yearly cost, cash tied up, months of cover and storage fit. The planner chooses the quantity; nothing is ordered.
Premortem before a decision
Before your team commits to a plan that is hard to undo, such as a move, a launch or a new system, a short workshop pictures it a few months on, already failed. The record ranks the reasons, turns each top risk into a check, a warning sign and an owner, and leaves the go decision with the owner.
Project handover readiness check
When a finished deliverable is ready for the team that will run it, the project manager brings one checklist against that team's own requirements: acceptance evidence, instructions, access, training, support owners and open items. The receiving owner accepts or names the conditions still to meet.
Project intake and capacity review
When a new initiative is proposed, the portfolio owner sees it scored on the business's own criteria beside the projects already committed, the delivery days it would use month by month, and what it would crowd out or push later. The owner accepts, defers or rejects it.
Project lessons review
When a phase or a project ends, the project manager gets one blameless review: whether it achieved what it was for, how scope, schedule and budget moved and why, whether the success measures were the right ones, and practice changes for the team to choose, each with an owner and a follow-up date.
Project scope baseline
A project manager turns an approved brief into a draft scope baseline: the deliverables, what is excluded, the acceptance criteria for each deliverable, the constraints and the open questions for the sponsor. Nothing implied counts as scope until the sponsor says so.