Capabilities directory

Find your team’s next superpower.

Results

27 capabilities, showing 1 to 24

  • Business insurance renewal review

    Before the business insurance renews, the owner gets one pack: every policy with insurer, limits, deductibles, premium and dates; renewal terms beside expiring ones, every change marked; what changed in the business; claims; and questions for the broker. The broker and the owner decide all cover.

  • Contractor safety prequalification

    For a named job, the operations, facilities or site manager gets a safety questionnaire scaled to the risk of the work, then a record of the contractor's answers scored only on the evidence supplied, with every gap, the conditions that close it and a review date. A competent person decides.

  • Cost of poor quality worksheet

    An owner or operations lead who senses that rework, scrap and returns are costly gets one worksheet: the failure costs already on record, sorted by category, with estimates, gaps and unresolved allocations listed. The owner decides what to fix first.

  • Delegation brief and follow-up

    Every task a manager hands over goes with a clear brief: what to deliver, in what form, by what date and time, why it matters, who will use it, what the person may decide alone and when the manager will check in. Each week, one list shows what is open, what is late and the next note to send.

  • Employee health plan comparison

    For an owner or people lead at renewal: the broker's health plan options next to each other, with premiums split between company and employee, deductibles, out-of-pocket limits, network notes, the cost to the company and to a typical employee at low, middle and high use, and questions for the broker.

    • People and HR
    • Construction (filtered by)
    • Growth & scaling (filtered by)
  • Ergonomic review inputs

    For a supervisor preparing for an ergonomics assessor or a worker's complaint about a task: a task observation record of each step's movements, durations, loads and measurements as supplied, the measurements still missing, and what the people who do the task said.

  • Inbox triage

    The owner, or the assistant who keeps their inbox, starts the day knowing what needs a reply today, what can wait and until when, and what belongs to someone else, with a draft or a forwarding note for each. Nothing is sent, archived, deleted or moved, and no mailbox login is needed.

  • Leadership meeting rhythm

    Your chief executive gets a proposed calendar of leadership forums and written reports, built from today's meetings and the decisions left waiting: each forum with its purpose, inputs, attendees, frequency and one decision owner, and the hours it gives back. The chief executive chooses; no calendar is changed.

    • Leadership
    • Construction (filtered by)
    • Growth & scaling (filtered by)
  • Lone work arrangements review

    For each task someone does alone, the manager gets the check-in method, the places where nobody could be reached, who responds when a check-in is missed and how soon, and alternatives. A competent person decides what is acceptable.

  • Premortem before a decision

    Before your team commits to a plan that is hard to undo, such as a move, a launch or a new system, a short workshop pictures it a few months on, already failed. The record ranks the reasons, turns each top risk into a check, a warning sign and an owner, and leaves the go decision with the owner.

  • Process map and bottleneck review

    Map one process step by step: who does each step, how long work waits and how long it takes, where it is handed over and where it gets sent back. Then find the one step that caps how much gets finished, and what to try there first. The owner decides what changes.

  • Project handover readiness check

    When a finished deliverable is ready for the team that will run it, the project manager brings one checklist against that team's own requirements: acceptance evidence, instructions, access, training, support owners and open items. The receiving owner accepts or names the conditions still to meet.

  • Project lessons review

    When a phase or a project ends, the project manager gets one blameless review: whether it achieved what it was for, how scope, schedule and budget moved and why, whether the success measures were the right ones, and practice changes for the team to choose, each with an owner and a follow-up date.

  • Project scope baseline

    A project manager turns an approved brief into a draft scope baseline: the deliverables, what is excluded, the acceptance criteria for each deliverable, the constraints and the open questions for the sponsor. Nothing implied counts as scope until the sponsor says so.

  • Project status report

    The lead of an internal project gets a status report the sponsor can read in two minutes: each workstream red, amber or green with the reason, what moved, who must clear each blocker, the decisions needed and the dates at risk. No milestone is called done without evidence, and the lead confirms every status.

  • Schedule recovery options

    When a committed milestone slips, the project manager brings the sponsor two to four ways back: what each changes, the dates it gives every later milestone and dependency, and the assumptions it rests on. The sponsor chooses; delivery leads confirm the dates.

  • Scope change impact review

    When new work turns up in a project plan, the project manager gets one review: every deliverable compared with the agreed baseline, each addition marked approved or not, its estimated effect on effort, cost and the end date, and the decision the sponsor has to make. The sponsor accepts or declines each one.

  • Site safety induction pack

    For one named site, the site, facilities or people lead gets an induction built from that site's own emergency arrangements, rules and hazards, with a short check of understanding, a sign-off record for each person and refresher dates by role. A competent person approves it and delivers it.

    • People and HR
    • Construction (filtered by)
    • Growth & scaling (filtered by)
  • Stakeholder and decision rights map

    Before kickoff, the project manager holds one map of everyone the project touches: each group placed by influence and interest, every key decision with exactly one accountable owner, the decision makers still missing, and who hears what, when and from whom. The sponsor confirms every decision right.

  • Supplier issue notice

    When a supplier bills for more than was ordered or received, or falls short of an agreed delivery or quality target, the buyer gets a formal notice ready for approval: each problem set against the record, the evidence listed, what the supplier must do and the date to reply by. A person approves and sends it.

  • Supplier risk alert brief

    When something happens to a supplier you depend on, the buyer gets a dated brief the same day: what happened and who reported it when, what you buy from them, how many days of stock you hold against how long another source would take, how exposed you are, and actions with owners and dates.

  • Supplier spend analysis

    From one accounts-payable export, the finance or operations lead sees where the money goes: spend cleaned and grouped by category and supplier, the few suppliers that take most of it, the tail, needs bought from several suppliers and consolidation opportunities, each with its figures. A person decides what to act on.

  • Temporary change register

    For a site or operations manager with temporary changes to equipment, layout or process still in place: a register of every change with its expiry date, the checks still outstanding and the procedures and training it touches, ready for the competent person who decides what happens next.

  • Thirteen-week cash flow forecast

    The owner sees cash week by week for the next thirteen weeks: what comes in, what goes out, the lowest point and every week below the floor they set, with each assumption written on the page. The forecast informs the decision; the owner makes it, and nothing is paid or moved.