Capabilities directory
Find your team’s next superpower.
Results
38 capabilities, showing 1 to 24
Business insurance renewal review
Before the business insurance renews, the owner gets one pack: every policy with insurer, limits, deductibles, premium and dates; renewal terms beside expiring ones, every change marked; what changed in the business; claims; and questions for the broker. The broker and the owner decide all cover.
Contractor safety prequalification
For a named job, the operations, facilities or site manager gets a safety questionnaire scaled to the risk of the work, then a record of the contractor's answers scored only on the evidence supplied, with every gap, the conditions that close it and a review date. A competent person decides.
Cost of poor quality worksheet
An owner or operations lead who senses that rework, scrap and returns are costly gets one worksheet: the failure costs already on record, sorted by category, with estimates, gaps and unresolved allocations listed. The owner decides what to fix first.
Customer feedback themes
Each month your support lead sees what customers keep telling you: tickets, disputes, reviews and survey comments grouped into themes with counts and quotations, the three issues most worth fixing with a proposed fix and owner, and a note for customers once a fix ships. A person decides every fix.
Emergency drill brief
Before a fire, evacuation or other drill, the site or office manager gets one brief: the scenario the responsible person has approved, who does what, what each observer records, and the questions for the debrief. It writes no emergency plan.
Employee health plan comparison
For an owner or people lead at renewal: the broker's health plan options next to each other, with premiums split between company and employee, deductibles, out-of-pocket limits, network notes, the cost to the company and to a typical employee at low, middle and high use, and questions for the broker.
Ergonomic review inputs
For a supervisor preparing for an ergonomics assessor or a worker's complaint about a task: a task observation record of each step's movements, durations, loads and measurements as supplied, the measurements still missing, and what the people who do the task said.
Hiring pipeline status report
Each week your people lead or founder sees every open role on one page: applications at each stage, days open against the target, roles running late, pass-through between stages, which sources lead to interviews, and every blocker with its owner. It counts; it never assesses a candidate.
Inbox triage
The owner, or the assistant who keeps their inbox, starts the day knowing what needs a reply today, what can wait and until when, and what belongs to someone else, with a draft or a forwarding note for each. Nothing is sent, archived, deleted or moved, and no mailbox login is needed.
Interview plan and scorecard
Before the first interview, the hiring manager and every interviewer share one plan: the criteria the role needs, the same questions in the same order for every candidate, and a blank scorecard each person fills in alone. It rates no one. People make every decision about a candidate.
Interview process review after a hiring round
After a hiring round closes, the recruiting lead gets a review of the interview process: questions that gave no usable evidence, competencies nobody covered, inconsistent rubric use, and revisions to approve before the next search. It reviews the process only; no candidate is assessed.
Job description
A hiring manager’s rough notes become a job description the right people want to answer: why the role exists, the work itself, and only the must-haves that are real. Your approved pay and employer wording go in untouched, and nothing is posted until the hiring manager and the people lead approve it.
Job posting and sourcing plan
For one approved role, the hiring manager gets a plan for where to post and where to look: every channel on the company's own list ordered by the signal it should give for that kind of role, a week-by-week schedule inside the budget, and what to count on each channel. Nothing is posted or paid until a person approves.
Leadership meeting rhythm
Your chief executive gets a proposed calendar of leadership forums and written reports, built from today's meetings and the decisions left waiting: each forum with its purpose, inputs, attendees, frequency and one decision owner, and the hours it gives back. The chief executive chooses; no calendar is changed.
Lone work arrangements review
For each task someone does alone, the manager gets the check-in method, the places where nobody could be reached, who responds when a check-in is missed and how soon, and alternatives. A competent person decides what is acceptable.
Premortem before a decision
Before your team commits to a plan that is hard to undo, such as a move, a launch or a new system, a short workshop pictures it a few months on, already failed. The record ranks the reasons, turns each top risk into a check, a warning sign and an owner, and leaves the go decision with the owner.
Preventive maintenance plan
For one site, the facilities or operations manager gets every piece of equipment ranked by failure cost, an approach for each (run to failure, scheduled or condition-based), a dated calendar of tasks from the maker's guidance and the failure history, the spare parts to hold and the downtime measures to track.
Price change review
Before prices change, the owner or finance lead gets one review: the margin on each product or service from the sales and cost exports, how costs have moved, what each proposed price does to sales and gross profit across a stated range of customer responses, and dated competitor prices. It recommends no price.
Process map and bottleneck review
Map one process step by step: who does each step, how long work waits and how long it takes, where it is handed over and where it gets sent back. Then find the one step that caps how much gets finished, and what to try there first. The owner decides what changes.
Project handover readiness check
When a finished deliverable is ready for the team that will run it, the project manager brings one checklist against that team's own requirements: acceptance evidence, instructions, access, training, support owners and open items. The receiving owner accepts or names the conditions still to meet.
Project lessons review
When a phase or a project ends, the project manager gets one blameless review: whether it achieved what it was for, how scope, schedule and budget moved and why, whether the success measures were the right ones, and practice changes for the team to choose, each with an owner and a follow-up date.
Project scope baseline
A project manager turns an approved brief into a draft scope baseline: the deliverables, what is excluded, the acceptance criteria for each deliverable, the constraints and the open questions for the sponsor. Nothing implied counts as scope until the sponsor says so.
Project status report
The lead of an internal project gets a status report the sponsor can read in two minutes: each workstream red, amber or green with the reason, what moved, who must clear each blocker, the decisions needed and the dates at risk. No milestone is called done without evidence, and the lead confirms every status.
Reference check question plan
After the interviews, the recruiter gets short reference calls aimed only at what the panel still could not establish, put to the referees the candidate named and agreed to, with a note sheet for each call that keeps the referee's own words. It gives no view on the candidate.