Production schedule rebuild

When orders or forecasts change, the production planner gets a draft build schedule from open orders, work-centre capacity and material availability, with every overload and shortage listed, not quietly fixed. The planner checks feasibility and approves the changes.

Put this on your planBuild this in a sprint

Add it to a workflow in the Fully Powered Planner, beside the teams and roles that will run it. Book a fit call

The outcome

An order moves, a rush arrives, a forecast is revised, and the planner has a new draft schedule the same day instead of rebuilding a spreadsheet. Each order that can be placed sits in the week it is due. Each work centre shows its hours against its capacity, and each material shows its balance week by week.

Where the plan does not hold, the draft says so plainly: this work centre is over by this many hours in this week, this material runs out in this week, this order has nowhere to go. It does not shuffle work to hide the problem. Firm orders and forecast are kept apart, so the planner can see which problems exist on firm orders alone and which appear only if the forecast arrives.

The draft also lists every change to the current plan, so the planner approves each one knowingly. Weeks the plant has frozen are left alone.

Who starts the work, and when

The production planner runs it whenever the picture changes: a customer moves a date, a rush order lands, the forecast is revised, a supplier slips a delivery, or a work centre loses hours. It is also useful as the first draft of a regular weekly rebuild.

The planner reads the draft, checks it against what the floor can really do, and decides every conflict. Sales and purchasing are named beside the conflicts that depend on them, and the planner talks to them.

What they supply

  • The open orders, each with an item, a quantity, a due week, whether it is firm or a forecast, and whether it is a rush.
  • The routings: the hours each unit of an item needs at each work centre.
  • The capacity of each work centre, in hours, for each week covered.
  • The bills of material: how much of each material one unit of an item uses.
  • Material supply: stock on hand and receipts due, each marked confirmed or not.
  • The current plan, if there is one, so the draft can show what would change.
  • Settings: the weeks covered and how many of them are frozen.

What comes out

One draft in a fixed order: the schedule by week; each work centre's load against its capacity; each material's balance; the capacity conflicts and material shortages, with the orders involved and any room left in other weeks; the orders that could not be placed and why; the changes to the current plan held for approval; and a numbered list of decisions for the planner. Check lines prove that the hours and materials in the draft add up to the orders behind them.

The draft releases no work order, orders no material and changes no record.

An invented example

Illustrative example with invented data. The company, the items, the orders, the work centres and every figure below are invented. "Company A" is an invented 30-person maker of steel shelving. The production planner runs the rebuild after a customer pulls an order forward and a rush order arrives; the sales lead, the purchasing lead and the plant manager answer the questions that depend on them. First come the inputs the planner supplied, in full, then the draft the capability returned.

The inputs

1. Settings

Plan date: Monday 16 November 2026.
Weeks covered: 2026-11-16, 2026-11-23, 2026-11-30, 2026-12-07
Frozen weeks: 1 (the week of 2026-11-16)
Production planner: Production planner
Work centres: Cutting, Welding

2. Open orders (open_orders.csv)

order_id,item,quantity,due_week,type,priority
O-5101,S1,200,2026-11-16,firm,normal
O-5102,S2,80,2026-11-23,firm,normal
O-5103,S3,100,2026-11-23,firm,normal
O-5104,S2,60,2026-11-30,firm,normal
O-5105,S1,300,2026-11-16,firm,rush
O-5106,S3,50,2026-12-07,firm,normal
O-5107,S2,40,2026-12-07,firm,normal
O-5108,S1,50,2026-11-09,firm,normal
F-01,S2,100,2026-11-30,forecast,normal
F-02,S1,400,2026-12-14,forecast,normal

3. Routings (routings.csv)

item,work_centre,hours_per_unit
S1,Cutting,0.10
S1,Welding,0.20
S2,Cutting,0.30
S2,Welding,0.50
S3,Cutting,0.20
S3,Welding,0.40

4. Capacity (capacity.csv)

work_centre,week,available_hours
Cutting,2026-11-16,50
Cutting,2026-11-23,50
Cutting,2026-11-30,50
Cutting,2026-12-07,50
Welding,2026-11-16,60
Welding,2026-11-23,70
Welding,2026-11-30,70

5. Bills of material (bom.csv)

item,material,quantity_per_unit
S1,Steel strip,2
S1,Fastener kit,1
S2,Steel strip,6
S2,Fastener kit,4
S3,Steel strip,4
S3,Fastener kit,2

6. Material supply (material_supply.csv)

material,week,units,status
Steel strip,2026-11-16,1000,on_hand
Steel strip,2026-11-23,600,confirmed
Steel strip,2026-11-30,800,requested
Steel strip,2026-12-07,300,confirmed
Fastener kit,2026-11-16,800,on_hand
Fastener kit,2026-11-23,300,confirmed
Fastener kit,2026-12-07,200,confirmed

7. Current plan (current_plan.csv)

order_id,planned_week
O-5101,2026-11-16
O-5102,2026-11-23
O-5103,2026-11-30
O-5104,2026-11-30
O-5106,2026-12-07
O-5099,2026-11-23

The draft

PRODUCTION SCHEDULE REBUILD: plan of 2026-11-16

For: Production planner. Weeks covered: 2026-11-16 to 2026-12-07. Frozen: 2026-11-16. Hours to one decimal; materials in the units supplied.
Inputs: open orders open_orders.csv; routings routings.csv; capacity capacity.csv; bills of material bom.csv; material supply material_supply.csv; current plan current_plan.csv.
Orders: 10 open rows. 7 placed (6 firm, 1 forecast). 2 not placed. 1 beyond the horizon.

Draft build schedule
2026-11-16 (frozen)
O-5101 S1 x 200, firm, due 2026-11-16
2026-11-23
O-5102 S2 x 80, firm, due 2026-11-23
O-5103 S3 x 100, firm, due 2026-11-23
2026-11-30
O-5104 S2 x 60, firm, due 2026-11-30
F-01 S2 x 100, forecast, due 2026-11-30
2026-12-07
O-5106 S3 x 50, firm, due 2026-12-07
O-5107 S2 x 40, firm, due 2026-12-07

Load by work centre (hours: firm / firm plus forecast / available)
Cutting: 2026-11-16 20.0 / 20.0 / 50.0; 2026-11-23 44.0 / 44.0 / 50.0; 2026-11-30 18.0 / 48.0 / 50.0; 2026-12-07 22.0 / 22.0 / 50.0
Welding: 2026-11-16 40.0 / 40.0 / 60.0; 2026-11-23 80.0 / 80.0 / 70.0; 2026-11-30 30.0 / 80.0 / 70.0; 2026-12-07 40.0 / 40.0 / capacity not supplied

Capacity conflicts
Welding, 2026-11-23: load 80.0 (80.0 firm + 0.0 forecast), available 70.0, over by 10.0. Over on firm orders. Orders: O-5102 40.0; O-5103 40.0. Room in other weeks, firm plus forecast: 2026-11-16 20.0 (frozen); 2026-11-30 0.0; 2026-12-07 capacity not supplied.
Welding, 2026-11-30: load 80.0 (30.0 firm + 50.0 forecast), available 70.0, over by 10.0. Over only with forecast. Orders: O-5104 30.0; F-01 50.0. Room in other weeks, firm plus forecast: 2026-11-16 20.0 (frozen); 2026-11-23 0.0; 2026-12-07 capacity not supplied.
Room in a frozen week cannot be used without the planner's decision.

Material balances and shortages
Fastener kit
Firm orders: 2026-11-16 600; 2026-11-23 380; 2026-11-30 140; 2026-12-07 80
Firm plus forecast: 2026-11-16 600; 2026-11-23 380; 2026-11-30 -260; 2026-12-07 -320
Firm: covered. Firm plus forecast: first short 2026-11-30, largest shortfall 320 in 2026-12-07.
Short in 2026-11-30, used by: O-5104 240; F-01 400 (forecast).
Short in 2026-12-07, used by: O-5106 100; O-5107 160.
Unconfirmed supply: none supplied.
Steel strip
Firm orders: 2026-11-16 600; 2026-11-23 320; 2026-11-30 -40; 2026-12-07 -180
Firm plus forecast: 2026-11-16 600; 2026-11-23 320; 2026-11-30 -640; 2026-12-07 -780
Firm: first short 2026-11-30, largest shortfall 180 in 2026-12-07. Firm plus forecast: first short 2026-11-30, largest shortfall 780 in 2026-12-07.
Short in 2026-11-30, used by: O-5104 360; F-01 600 (forecast).
Short in 2026-12-07, used by: O-5106 200; O-5107 240.
Unconfirmed supply: 800 requested for 2026-11-30. Largest firm-plus-forecast shortfall if all were confirmed: none.

Orders not placed
O-5105 S1 x 300, firm, due 2026-11-16, RUSH: due in a frozen week. Would need: Cutting 30.0, Welding 60.0; Steel strip 600, Fastener kit 300.
O-5108 S1 x 50, firm, due 2026-11-09: due before the plan starts. Would need: Cutting 5.0, Welding 10.0; Steel strip 100, Fastener kit 50.

Beyond the horizon
F-02 S1 x 400, forecast, due 2026-12-14.

Changes to the current plan, held for approval
O-5103: moves from 2026-11-30 to 2026-11-23.
O-5107: new, placed 2026-12-07.
F-01: new, forecast, placed 2026-11-30.
O-5099: in the current plan for 2026-11-23 and not in the open orders; its load is not counted.

Not tested
Welding, 2026-12-07: capacity not supplied; its load of 40.0 is shown but not tested.

Decisions for the planner: 7
1. O-5105, a rush order for 300 S1 due in the frozen week of 2026-11-16 and not in the current plan. It would need 30.0 Cutting hours, 60.0 Welding hours, 600 Steel strip and 300 Fastener kit. The planner may need to ask the sales lead. Is the order to be placed, and in which week?
2. O-5108, an order for 50 S1 due the week of 2026-11-09, before the plan starts. It would need 5.0 Cutting hours, 10.0 Welding hours, 100 Steel strip and 50 Fastener kit. The planner may need to ask the sales lead. In which week is it to be built, if at all?
3. Welding is over by 10.0 hours in the week of 2026-11-23, on firm orders O-5102 and O-5103. The only known room in another week is 20.0 hours in the frozen week of 2026-11-16; 2026-12-07 has no capacity row. The planner may need to ask the plant manager and the sales lead. What is to be done about the 10.0 hours?
4. Welding is over by 10.0 hours in the week of 2026-11-30 only if forecast F-01 is built. The planner may need to ask the sales lead. Is F-01 to stay in the schedule in that week?
5. Fastener kit is short only if forecast F-01 is built: 260 in the week of 2026-11-30, and 320 at its largest in 2026-12-07, after confirmed receipts of 300 and 200. The planner may need to ask the purchasing lead. What is to be done about the shortage if F-01 is built?
6. Steel strip is short on firm orders from the week of 2026-11-30 (40), and 180 at its largest in 2026-12-07. With the forecast it is short from the same week (640), and 780 at its largest in 2026-12-07. A receipt of 800 for 2026-11-30 is requested and not confirmed; the balances do not count it. The planner may need to ask the purchasing lead. How is the shortage to be settled if the 800 is not confirmed?
7. O-5099 is in the current plan for the week of 2026-11-23 and is not among the open orders, so its load and materials are not counted. The planner may need to ask the sales lead. Is O-5099 cancelled, or is it missing from the open orders?

Check lines
Cutting, firm: weekly loads 104.0 = orders 104.0. Firm plus forecast: 134.0 = 134.0.
Welding, firm: weekly loads 190.0 = orders 190.0. Firm plus forecast: 240.0 = 240.0.
Fastener kit, firm: opening 800 + confirmed receipts 500 - use 1220 = 80, the closing balance. Firm plus forecast: 800 + 500 - 1620 = -320.
Steel strip, firm: opening 1000 + confirmed receipts 900 - use 2080 = -180, the closing balance. Firm plus forecast: 1000 + 900 - 2680 = -780.
Open order rows 10 = placed 7 + not placed 2 + beyond the horizon 1.

Draft for the Production planner's approval. No work order has been released, no material ordered and no record changed.

Where it fits

It is not a demand and supply review, which compares demand with supply month by month and decides nothing about the shop floor. It is not an inventory reorder plan, which works out what to buy. This one places orders on a weekly build schedule and shows where the plant cannot meet it.

What has to change for your company

Set how many weeks are frozen. The template plans in weeks that start on a Monday; a different week would need the Monday checks changed. Decide what counts as a work centre in your plant, and keep the routings and capacities in one agreed export with the headers the template expects. Decide whether your forecast rows belong in the schedule at all. Agree who answers each kind of conflict: the planner for load, purchasing for material dates, sales for customer dates. Keep your own rules for sequencing within a week, set-up time and changeovers; this template places orders by week and does not sequence them.

What has been checked

Fully Powered AI wrote this capability template. It was editorially reviewed on 10 November 2026. It was tried once on its invented example in Claude on 10 November 2026, and the record of that run is published with the template; it lists the edits made afterward, which have not been run again. It has not yet been tested in a client environment. It has not yet been tested as a packaged version in ChatGPT, Claude, Copilot or Gemini.

Testing in your environment means running it on a past rebuild the planner already knows, with cases written in advance: a rush into a frozen week, a work centre with no capacity row, a material receipt that is not confirmed. The planner checks every hour and every balance before anyone relies on the draft. Demand and supply review is the monthly companion, and what we test before we call an AI workflow ready describes the record we keep.

The full capability template

Everything above is the outline. The complete capability template is the working version: the roles, the inputs, the procedure, the exceptions and stop conditions, the output format, the reviewer checklist, the acceptance tests, the instructions for an AI assistant and what to customize for your company. It comes with a download and the link to its folder in Fully Powered’s public repository.

View the full template

Free with an account. Sign in by email: no password and no card.

Next step

Put this capability to work for your team: on your plan, or built with you in a sprint.

Put this on your plan

Add it to a workflow in the Fully Powered Planner, beside the teams and roles that will run it.

Build this in a sprint

In a sprint, Fully Powered adapts this capability template to your rules, proves it on your own work and puts it in the hands of the roles that own it.

Two ways to begin:

Rather talk it through first? Book a fit callDiscuss adapting this