Workflows Directory

Find your team’s next superpower.

Results

39 workflow templates, showing 1 to 24

  • Ad to page check

    When a campaign's landing page is ready for a prelaunch check, the acquisition owner gets a findings list that sets each ad beside the captured page: message, offer details, form and next step, on mobile and desktop. Page states nobody captured are marked unknown.

    Starts it
    Acquisition owner
    Brings
    export, notes
    Gets
    4 outputs
  • Campaign audience check

    When an audience export is ready for review, the campaign owner gets it segmented with reconciled counts, the exclusions applied and the records whose contact status needs checking, with conflicts, stale records and duplicates kept visible.

    Starts it
    Campaign owner
    Brings
    export, notes
    Gets
    5 outputs
    • Advertising and lead generation (filtered by)
    • Growth & scaling (filtered by)
    • Consumer brands
  • Campaign build sheet

    When an approved campaign brief is ready to become a setup specification, the campaign operator gets one build sheet: names, audiences, exclusions, destinations, budgets and measurement fields, with every unresolved setting and missing asset marked as a gap. Nothing is built or spent.

    Starts it
    Campaign operator
    Brings
    export, notes
    Gets
    4 outputs
    • Advertising and lead generation (filtered by)
    • Growth & scaling (filtered by)
    • Consumer brands
  • Client document request tracker

    When a client sends its first batch of records, the engagement manager gets the request list brought up to date: each item and period marked received, incomplete, mentioned only or missing, plus a short follow-up draft. The manager judges what is sufficient and approves anything sent.

    Starts it
    Engagement manager
    Brings
    export, notes, pasted text
    Gets
    5 outputs
  • Client findings validation document

    Before research becomes recommendations, the engagement lead sends the client one document: each material finding beside its evidence, the implication proposed and a clear request to confirm, correct or defer it. Nothing is added that the evidence does not show.

    Starts it
    Engagement lead
    Brings
    export, notes, document, pasted text
    Gets
    5 outputs
  • Client-status update preparation

    Every client gets an accurate status update on schedule, drafted from the notes and the task list, with confirmed dates kept apart from estimates and the client’s open decisions in plain view.

    Starts it
    Project manager
    Brings
    export, notes, document, pasted text
    Gets
    5 outputs
  • Completed engagement file review

    The quality partner gets a worksheet that tests finished engagement files against the firm's own checklist: each item linked to the engagement letter, workpaper or sign-off that answers it, with any open finding, and the missing evidence listed. The quality partner confirms findings and assigns remediation.

    Starts it
    Quality partner
    Brings
    export, notes
    Gets
    4 outputs
  • Creative fatigue review

    When a campaign's reach or response pattern prompts a creative review, the paid media lead gets frequency and response set against the campaign's own baseline, by creative and audience, with other explanations marked and options to test.

    Starts it
    Paid media lead
    Brings
    export, notes
    Gets
    6 outputs
    • Advertising and lead generation (filtered by)
    • Growth & scaling (filtered by)
    • Consumer brands
  • Creative test evidence review

    When a batch of ad creative is ready for review, the creative strategist and media lead get an evidence table by creative, angle, format and hook, with tentative learning and next-test options. No winner or loser is named, and thin evidence is held back.

    Starts it
    Creative strategist
    Brings
    export, notes
    Gets
    6 outputs
  • Creator campaign plan

    Before a creator campaign starts, the marketing lead gets one plan: the goal, each creator's deal and deliverables, a base and a conservative budget checked against the budget supplied, the dates, the set-up before launch and the decisions. A person approves the spend.

    Starts it
    Creator programme lead
    Brings
    export, notes
    Gets
    8 outputs
  • Creator content reuse plan

    A brand marketer sees which published creator posts may be reused on which of the brand's channels, read only from the usage rights they supply, with every placement ending before the rights do. Where the rights are silent or unclear, the question goes to whoever reviews contracts.

    Starts it
    Brand marketer
    Brings
    export, notes
    Gets
    9 outputs
  • Daily production report

    When a shoot day wraps, the production coordinator gets a draft daily report from the call sheet, timecards and department reports: hours totaled as written, schedule changes noted, and every missing or overlapping entry listed as a query. The production manager checks it.

    Starts it
    Production coordinator
    Brings
    export, notes, document, pasted text
    Gets
    5 outputs
    • Project and delivery (filtered by)
    • Growth & scaling (filtered by)
    • Consumer brands
  • Discipline interface issue register

    After a coordination meeting exposes conflicts between disciplines, the design coordinator gets one register: each conflict from the minutes, linked to the clash-export rows and model revisions involved, with the lead who owns each system and the decision still needed. Nothing is resolved.

    Starts it
    Design coordinator
    Brings
    export, notes, document
    Gets
    5 outputs
    • Project and delivery (filtered by)
    • Growth & scaling (filtered by)
    • Construction
  • Engagement margin review

    Midway or at close, the partner and finance lead get one worksheet for an engagement: recorded time, agreed fee, billed to date and supplied costs by workstream, the gaps that limit it, and the questions the team must answer. No cost rate is invented.

    Starts it
    Finance analyst
    Brings
    export, notes
    Gets
    6 outputs
  • Engagement staffing plan

    When several engagements want the same people, the resource lead sees the collision before kickoff: role needs against free days, leave and competing assignments, week by week, with two or three staffing options. The resource lead and partners choose.

    Starts it
    Resource lead
    Brings
    export, notes
    Gets
    6 outputs
  • Implementation blocker brief

    When a customer's setup milestone slips, the implementation lead gets one brief: the missing inputs, the unresolved access and data questions and the dependencies behind the delay, each with its source and an owner, plus points to raise with the customer.

    Starts it
    Implementation lead
    Brings
    export, notes
    Gets
    6 outputs
  • Inherited campaign audit

    When an agency takes over an account or prepares a campaign health review, the media or analytics lead gets an inventory of what is running against the client's plan: mismatched offers, disagreeing destination pages, missing measurement evidence, and an owner for each follow-up.

    Starts it
    Media lead
    Brings
    export, notes
    Gets
    6 outputs
    • Advertising and lead generation (filtered by)
    • Growth & scaling (filtered by)
    • Consumer brands
  • Lead form field review

    When a client questions a long inquiry form or abandoned submissions, the conversion lead gets a field-by-field review: what each field is used for downstream, where people leave, and proposed labels, error messages and test questions. The lead and the client's data owner decide every change.

    Starts it
    Conversion lead
    Brings
    export, notes, document
    Gets
    6 outputs
  • Lead quality pattern review

    When sales feedback or results raise a lead-quality concern, the acquisition lead gets a review of leads and their outcomes by source, page, location, device and timing, with cases to verify with sales and possible measurement faults listed.

    Starts it
    Acquisition lead
    Brings
    export, notes
    Gets
    5 outputs
  • Matter budget and status summary

    The responsible partner sees one matter whole: scope, phases against their dates, the budget against fees to date and the projected total, a red, amber or green status with the rule behind it, risks and next actions with owners. Built from the time export and the matter plan, never a view on the merits.

    Starts it
    Matter lead
    Brings
    export, notes, document
    Gets
    10 outputs
  • Missed milestone client reply

    When a client challenges a delay, a deliverable or an earlier commitment, the account director gets a draft reply and an internal action note that keep confirmed facts apart from proposed recovery steps and the decisions still needed. Nothing is sent.

    Starts it
    Account director
    Brings
    export, notes, document, pasted text
    Gets
    2 outputs
  • Pilot build readiness brief

    Before a prototype or pilot build, the build lead gets one brief: part shortages, revision conflicts and open actions set against the team’s own build checklist, with allocated parts kept apart from received ones. People confirm; nothing is released.

    Starts it
    Build lead
    Brings
    export, notes, document
    Gets
    7 outputs
    • Project and delivery (filtered by)
    • Growth & scaling (filtered by)
    • Consumer brands
  • Premortem before a decision

    Before your team commits to a plan that is hard to undo, such as a move, a launch or a new system, a short workshop pictures it a few months on, already failed. The record ranks the reasons, turns each top risk into a check, a warning sign and an owner, and leaves the go decision with the owner.

    Starts it
    Owner
    Brings
    notes
    Gets
    4 outputs
  • Program outcome map

    Before an evaluation, the program and evaluation leads get one map linking each activity to the outcome it is meant to serve, with proposed measures, data sources, assumptions and the questions the evidence cannot yet answer. It claims no impact.

    Starts it
    Program lead
    Brings
    export, notes
    Gets
    8 outputs