Workflows Directory

Find your team’s next superpower.

Results

8 workflow templates

  • Audit evidence index

    The quality lead gets an index of everything an audit has asked to see: each request linked to the document that answers it, its version and owner, the records found and the gaps. The quality owner decides what is shared; nothing is certified or sent.

    Starts it
    Quality lead
    Brings
    export, notes
    Gets
    6 outputs
  • Deliverable issue completeness check

    As a calculation, report or drawing package nears issue, the quality reviewer or document controller gets a checklist: missing review records, revisions that disagree between the index, the register and the title block, and citations of out-of-date calculations. Issue stays with the engineers.

    Starts it
    Quality reviewer
    Brings
    export, notes
    Gets
    5 outputs
    • Quality management (filtered by)
    • Engineering firms (filtered by)
    • Construction
  • Program outcome map

    Before an evaluation, the program and evaluation leads get one map linking each activity to the outcome it is meant to serve, with proposed measures, data sources, assumptions and the questions the evidence cannot yet answer. It claims no impact.

    Starts it
    Program lead
    Brings
    export, notes
    Gets
    8 outputs
    • Analytics and reporting (filtered by)
    • Government (filtered by)
    • Education
  • Punch list consolidation

    The site manager gets the punch list for the next closeout walk as one list grouped by location and trade, with repeated entries merged, photographs attached and a proposed follow-up date for each open item. Nothing is assigned, closed or accepted.

    Starts it
    Site manager
    Brings
    export, notes
    Gets
    7 outputs
  • RFI review package

    The project engineer gets one packet for each request for information: the register entry, the question word for word, the drawing revisions and specification extracts it touches, earlier responses, and a numbered list of what is unresolved. No answer is proposed.

    Starts it
    Project engineer
    Brings
    export, notes, pasted text
    Gets
    8 outputs
  • Site observation follow-up

    After a site visit, the visiting engineer and the project manager get one observation report: each field note beside its location, source photograph, drawing revision and any earlier register entry, a proposed follow-up owner, and the questions still open. It assesses no condition.

    Starts it
    Visiting engineer
    Brings
    export, notes
    Gets
    5 outputs
    • Quality management (filtered by)
    • Engineering firms (filtered by)
    • Construction
  • Submittal register review

    The project engineer gets one register of every required submittal: what has arrived, the review status as recorded, the documents still missing and the long-lead items at risk against the date each order must be placed. Nothing is routed, accepted or ordered.

    Starts it
    Project engineer
    Brings
    export, notes
    Gets
    6 outputs
  • Win-loss review

    Once a quarter your sales lead sees, from the deals you closed, where the losses ended, which kinds of deal you win and lose, what the largest deals show, and which findings rest on enough deals to act on. Actions are proposed in proportion to the evidence, and nothing in your sales system is changed.

    Starts it
    Sales lead
    Brings
    export, notes, document, pasted text
    Gets
    8 outputs
    • Sales
    • Analytics and reporting (filtered by)
    • Engineering firms (filtered by)