Workflows Directory

Find your team’s next superpower.

Results

10 workflow templates

  • Engagement margin review

    Midway or at close, the partner and finance lead get one worksheet for an engagement: recorded time, agreed fee, billed to date and supplied costs by workstream, the gaps that limit it, and the questions the team must answer. No cost rate is invented.

    Starts it
    Finance analyst
    Brings
    export, notes
    Gets
    6 outputs
  • Estimate basis pack

    An estimator pricing a job from drawings, takeoffs and supplier quotes gets one worksheet: every figure with its quantity source, rate source and date beside it, each exclusion listed and every gap already written as a scope question. The estimator verifies; the bid lead decides the figure.

    Starts it
    Estimator
    Brings
    export, notes
    Gets
    4 outputs
    • Sales
    • Finance and accounting (filtered by)
    • Procurement and suppliers (filtered by)
  • Matter closing checklist preparation

    When the handling lawyer flags a matter for closure, the firm's closing checklist is filled from the matter record: final billing as recorded, open tasks, unreturned items and the handoffs billing and records must accept.

    Starts it
    Operations assistant
    Brings
    export, notes, document
    Gets
    5 outputs
  • Matter-opening checklist preparation

    Every accepted matter goes into setup and billing with one checklist: the fields each system needs, the terms that drive the first invoice, the documents on file and an owner for every open item.

    Starts it
    Firm administrator
    Brings
    document
    Gets
    4 outputs
  • Month-end close checklist

    Before the month ends, your controller holds the whole close on one page: every task with its owner, its date and what it waits on, the chain that sets the close date, and each gap already written as a question. Entries are prepared for approval, never posted.

    Starts it
    Controller
    Brings
    export, notes
    Gets
    5 outputs
  • Receivables exception review

    The controller gets every short payment, unmatched or ambiguous receipt, possible duplicate and disputed invoice on one list, each with its evidence and a proposed next step, before anything is applied on a guess.

    Starts it
    Billing coordinator
    Brings
    export, notes, document
    Gets
    3 outputs
  • RFQ clarification list

    A buyer sending drawings and specifications out for quotation gets one list of missing details, conflicting revisions and ambiguous tolerances, and a record of each supplier's answers. The buyer approves every message; the engineer settles every technical question.

    Starts it
    Buyer
    Brings
    export, notes, pasted text
    Gets
    6 outputs
  • Submittal register review

    The project engineer gets one register of every required submittal: what has arrived, the review status as recorded, the documents still missing and the long-lead items at risk against the date each order must be placed. Nothing is routed, accepted or ordered.

    Starts it
    Project engineer
    Brings
    export, notes
    Gets
    6 outputs
  • Three-week look-ahead constraint review

    Before the coordination meeting, the superintendent gets a brief that sets each planned activity of the next three weeks beside what could hold it up: trades sharing an area, unfinished predecessors, open approvals, late deliveries and unanswered RFIs. The superintendent confirms the sequence and assigns the follow-up.

    Starts it
    Project engineer
    Brings
    export, notes
    Gets
    7 outputs
  • Weekly receivables summary

    The finance lead takes one page into each week’s management meeting: what came in, where every receivable stands, which exceptions are open and who owns them, and the decisions management must make. Every figure ties to the aging report.

    Starts it
    Billing coordinator
    Brings
    export, document
    Gets
    4 outputs
    • Finance and accounting (filtered by)
    • Engineering firms (filtered by)
    • Growth & scaling