Workflows Directory

Find your team’s next superpower.

Results

9 workflow templates

  • Audit evidence index

    The quality lead gets an index of everything an audit has asked to see: each request linked to the document that answers it, its version and owner, the records found and the gaps. The quality owner decides what is shared; nothing is certified or sent.

    Starts it
    Quality lead
    Brings
    export, notes
    Gets
    6 outputs
  • Cloud spend variance bridge

    When cloud or tooling costs move away from budget, the finance lead and the engineering manager get a bridge from budget to actual by service and cost owner, with usage beside each large move, the unallocated and shared costs, and the questions each side must answer.

    Starts it
    Finance lead
    Brings
    export, notes
    Gets
    6 outputs
  • Deliverable issue completeness check

    As a calculation, report or drawing package nears issue, the quality reviewer or document controller gets a checklist: missing review records, revisions that disagree between the index, the register and the title block, and citations of out-of-date calculations. Issue stays with the engineers.

    Starts it
    Quality reviewer
    Brings
    export, notes
    Gets
    5 outputs
    • Quality management (filtered by)
    • Engineering firms (filtered by)
    • Construction
  • Employee offboarding and handover checklist

    When someone leaves, your HR lead and their manager share one checklist: every piece of their work handed to a named colleague before the last day, every system on your access register removed by its owner at a set time, and every item of equipment back. Nothing is removed or sent without a person.

    Starts it
    People lead
    Brings
    export, notes
    Gets
    7 outputs
    • People and HR
    • IT and systems (filtered by)
    • Software technology (filtered by)
  • Pilot acceptance-test preparation

    Go into every AI pilot with the test already written: the cases that matter, what good looks like for each and the rule your owner will use to decide.

    Starts it
    Pilot owner
    Brings
    notes, document
    Gets
    4 outputs
  • Punch list consolidation

    The site manager gets the punch list for the next closeout walk as one list grouped by location and trade, with repeated entries merged, photographs attached and a proposed follow-up date for each open item. Nothing is assigned, closed or accepted.

    Starts it
    Site manager
    Brings
    export, notes
    Gets
    7 outputs
  • RFI review package

    The project engineer gets one packet for each request for information: the register entry, the question word for word, the drawing revisions and specification extracts it touches, earlier responses, and a numbered list of what is unresolved. No answer is proposed.

    Starts it
    Project engineer
    Brings
    export, notes, pasted text
    Gets
    8 outputs
  • Site observation follow-up

    After a site visit, the visiting engineer and the project manager get one observation report: each field note beside its location, source photograph, drawing revision and any earlier register entry, a proposed follow-up owner, and the questions still open. It assesses no condition.

    Starts it
    Visiting engineer
    Brings
    export, notes
    Gets
    5 outputs
    • Quality management (filtered by)
    • Engineering firms (filtered by)
    • Construction
  • Submittal register review

    The project engineer gets one register of every required submittal: what has arrived, the review status as recorded, the documents still missing and the long-lead items at risk against the date each order must be placed. Nothing is routed, accepted or ordered.

    Starts it
    Project engineer
    Brings
    export, notes
    Gets
    6 outputs