Workflows Directory
Find your team’s next superpower.
- Function: Procurement and suppliers
- Function: Quality management
- Industry: Engineering firms
- Industry: Government
- Clear all filters
Results
11 workflow templates
Audit evidence index
The quality lead gets an index of everything an audit has asked to see: each request linked to the document that answers it, its version and owner, the records found and the gaps. The quality owner decides what is shared; nothing is certified or sent.
- Starts it
- Quality lead
- Brings
- export, notes
- Gets
- 6 outputs
Bid or no-bid and RFP response plan
Before anyone starts on a response, your bid manager sees every requirement in the request checked against your own evidence, your bid criteria tested and the buyer questions ready. A named person decides whether to bid; then a dated plan says who does what by when.
- Starts it
- Bid manager
- Brings
- export, notes, document
- Gets
- 6 outputs
Deliverable issue completeness check
As a calculation, report or drawing package nears issue, the quality reviewer or document controller gets a checklist: missing review records, revisions that disagree between the index, the register and the title block, and citations of out-of-date calculations. Issue stays with the engineers.
- Starts it
- Quality reviewer
- Brings
- export, notes
- Gets
- 5 outputs
Estimate basis pack
An estimator pricing a job from drawings, takeoffs and supplier quotes gets one worksheet: every figure with its quantity source, rate source and date beside it, each exclusion listed and every gap already written as a scope question. The estimator verifies; the bid lead decides the figure.
- Starts it
- Estimator
- Brings
- export, notes
- Gets
- 4 outputs
Punch list consolidation
The site manager gets the punch list for the next closeout walk as one list grouped by location and trade, with repeated entries merged, photographs attached and a proposed follow-up date for each open item. Nothing is assigned, closed or accepted.
- Starts it
- Site manager
- Brings
- export, notes
- Gets
- 7 outputs
RFI review package
The project engineer gets one packet for each request for information: the register entry, the question word for word, the drawing revisions and specification extracts it touches, earlier responses, and a numbered list of what is unresolved. No answer is proposed.
- Starts it
- Project engineer
- Brings
- export, notes, pasted text
- Gets
- 8 outputs
RFQ clarification list
A buyer sending drawings and specifications out for quotation gets one list of missing details, conflicting revisions and ambiguous tolerances, and a record of each supplier's answers. The buyer approves every message; the engineer settles every technical question.
- Starts it
- Buyer
- Brings
- export, notes, pasted text
- Gets
- 6 outputs
Site observation follow-up
After a site visit, the visiting engineer and the project manager get one observation report: each field note beside its location, source photograph, drawing revision and any earlier register entry, a proposed follow-up owner, and the questions still open. It assesses no condition.
- Starts it
- Visiting engineer
- Brings
- export, notes
- Gets
- 5 outputs
Submittal register review
The project engineer gets one register of every required submittal: what has arrived, the review status as recorded, the documents still missing and the long-lead items at risk against the date each order must be placed. Nothing is routed, accepted or ordered.
- Starts it
- Project engineer
- Brings
- export, notes
- Gets
- 6 outputs
Teaching tool vendor data questions
Before a school or college adopts a teaching tool that would handle student or staff information, the privacy or procurement lead gets a scoped question pack on data flows, access, retention and subprocessors, with each supplied vendor document mapped to the questions and the gaps listed.
- Starts it
- Privacy lead
- Brings
- export, notes, document
- Gets
- 5 outputs
Three-week look-ahead constraint review
Before the coordination meeting, the superintendent gets a brief that sets each planned activity of the next three weeks beside what could hold it up: trades sharing an area, unfinished predecessors, open approvals, late deliveries and unanswered RFIs. The superintendent confirms the sequence and assigns the follow-up.
- Starts it
- Project engineer
- Brings
- export, notes
- Gets
- 7 outputs