Workflows Directory
Find your team’s next superpower.
- Function: Project and delivery
- Function: Quality management
- Industry: Construction
- Industry: Government
- Industry: Insurance
- Industry: Software technology
- Clear all filters
Results
30 workflow templates, showing 1 to 24
Academic calendar check
While year, term and session dates are being assembled, your registrar gets a draft calendar with every registration window tied to its term, and every conflicting, missing or out-of-bounds date listed as a question. Nothing is published or changed.
- Starts it
- Registrar
- Brings
- export, notes
- Gets
- 3 outputs
Cost of poor quality worksheet
An owner or operations lead who senses that rework, scrap and returns are costly gets one worksheet: the failure costs already on record, sorted by category, with estimates, gaps and unresolved allocations listed. The owner decides what to fix first.
- Starts it
- Owner
- Brings
- export, notes
- Gets
- 6 outputs
Deliverable issue completeness check
As a calculation, report or drawing package nears issue, the quality reviewer or document controller gets a checklist: missing review records, revisions that disagree between the index, the register and the title block, and citations of out-of-date calculations. Issue stays with the engineers.
- Starts it
- Quality reviewer
- Brings
- export, notes
- Gets
- 5 outputs
Design assumption change register
When client criteria or design assumptions change, the project engineer gets one sourced register: what changed, which recorded requirements it touches, how firm each source is, and what still needs confirmation. No design basis is altered.
- Starts it
- Project engineer
- Brings
- export, notes
- Gets
- 6 outputs
Discipline interface issue register
After a coordination meeting exposes conflicts between disciplines, the design coordinator gets one register: each conflict from the minutes, linked to the clash-export rows and model revisions involved, with the lead who owns each system and the decision still needed. Nothing is resolved.
- Starts it
- Design coordinator
- Brings
- export, notes, document
- Gets
- 5 outputs
Implementation blocker brief
When a customer's setup milestone slips, the implementation lead gets one brief: the missing inputs, the unresolved access and data questions and the dependencies behind the delay, each with its source and an owner, plus points to raise with the customer.
- Starts it
- Implementation lead
- Brings
- export, notes
- Gets
- 6 outputs
Incident investigation and corrective actions
After an injury, near miss or property damage, the site, operations or safety manager gets the investigation written up from the evidence: a timeline, the immediate and underlying causes, actions with owners and dates, and a register that follows each action until a check shows it worked.
- Starts it
- Site manager
- Brings
- export, notes, document
- Gets
- 8 outputs
Launch checklist
Whoever owns a launch date gets one dated checklist for the weeks before, the day itself and the weeks after, with an owner on every line. Each announcement is written out so the approver sees exactly what goes out, to whom and from where before saying go. Nothing is announced by the assistant.
- Starts it
- Owner
- Brings
- export, notes
- Gets
- 6 outputs
Meeting agenda, notes and follow-ups
Whoever runs the meeting walks in with an agenda where every topic has an outcome and a time, and walks out with a one-page record: what was decided, who owns each action and by when, and what is still open. Nothing reaches anyone until that person has read it and sends it.
- Starts it
- Team lead
- Brings
- notes
- Gets
- 4 outputs
Missed milestone client reply
When a client challenges a delay, a deliverable or an earlier commitment, the account director gets a draft reply and an internal action note that keep confirmed facts apart from proposed recovery steps and the decisions still needed. Nothing is sent.
- Starts it
- Account director
- Brings
- export, notes, document, pasted text
- Gets
- 2 outputs
Nonconformity record draft
A quality lead or supervisor who has spotted something wrong gets a draft record: the observation set against the stated requirement, the affected work counted from the register, and the containment options. The quality owner decides every call.
- Starts it
- Quality lead
- Brings
- export, notes
- Gets
- 1 output
Obsolete copy check
The quality lead gets the master document list set against the copies found at each point of use: which copies are out of date, which withdrawn documents are still held, and what proof of withdrawal exists. The document owner withdraws and replaces copies; nothing is changed.
- Starts it
- Document controller
- Brings
- export, notes
- Gets
- 6 outputs
Premortem before a decision
Before your team commits to a plan that is hard to undo, such as a move, a launch or a new system, a short workshop pictures it a few months on, already failed. The record ranks the reasons, turns each top risk into a check, a warning sign and an owner, and leaves the go decision with the owner.
- Starts it
- Owner
- Brings
- notes
- Gets
- 4 outputs
Process map and bottleneck review
Map one process step by step: who does each step, how long work waits and how long it takes, where it is handed over and where it gets sent back. Then find the one step that caps how much gets finished, and what to try there first. The owner decides what changes.
- Starts it
- Operations lead
- Brings
- export, notes
- Gets
- 7 outputs
Program outcome map
Before an evaluation, the program and evaluation leads get one map linking each activity to the outcome it is meant to serve, with proposed measures, data sources, assumptions and the questions the evidence cannot yet answer. It claims no impact.
- Starts it
- Program lead
- Brings
- export, notes
- Gets
- 8 outputs
Project handover readiness check
When a finished deliverable is ready for the team that will run it, the project manager brings one checklist against that team's own requirements: acceptance evidence, instructions, access, training, support owners and open items. The receiving owner accepts or names the conditions still to meet.
- Starts it
- Project manager
- Brings
- export, notes
- Gets
- 6 outputs
Project intake and capacity review
When a new initiative is proposed, the portfolio owner sees it scored on the business's own criteria beside the projects already committed, the delivery days it would use month by month, and what it would crowd out or push later. The owner accepts, defers or rejects it.
- Starts it
- Portfolio owner
- Brings
- export, notes, document
- Gets
- 6 outputs
Project lessons review
When a phase or a project ends, the project manager gets one blameless review: whether it achieved what it was for, how scope, schedule and budget moved and why, whether the success measures were the right ones, and practice changes for the team to choose, each with an owner and a follow-up date.
- Starts it
- Project manager
- Brings
- export, notes
- Gets
- 8 outputs
Project scope baseline
A project manager turns an approved brief into a draft scope baseline: the deliverables, what is excluded, the acceptance criteria for each deliverable, the constraints and the open questions for the sponsor. Nothing implied counts as scope until the sponsor says so.
- Starts it
- Project manager
- Brings
- export, notes, document
- Gets
- 7 outputs
Project status report
The lead of an internal project gets a status report the sponsor can read in two minutes: each workstream red, amber or green with the reason, what moved, who must clear each blocker, the decisions needed and the dates at risk. No milestone is called done without evidence, and the lead confirms every status.
- Starts it
- Project lead
- Brings
- export, notes, pasted text
- Gets
- 7 outputs
Property diligence index
The transaction lead gets a diligence room in order: every document indexed by workstream, every checklist item and request tracked, and every open finding tied to the report or request that raised it. Specialists judge the findings; nothing is valued or sent.
- Starts it
- Transaction coordinator
- Brings
- export, notes
- Gets
- 5 outputs
Punch list consolidation
The site manager gets the punch list for the next closeout walk as one list grouped by location and trade, with repeated entries merged, photographs attached and a proposed follow-up date for each open item. Nothing is assigned, closed or accepted.
- Starts it
- Site manager
- Brings
- export, notes
- Gets
- 7 outputs
Repeat incident pattern review
A safety lead with a year of incident records and earlier actions gets them compared in groups: confirmed causes, what was done before, and where incidents recur, with questions for the team. A competent person judges what the pattern means.
- Starts it
- Investigation lead
- Brings
- export, notes
- Gets
- 6 outputs
RFI review package
The project engineer gets one packet for each request for information: the register entry, the question word for word, the drawing revisions and specification extracts it touches, earlier responses, and a numbered list of what is unresolved. No answer is proposed.
- Starts it
- Project engineer
- Brings
- export, notes, pasted text
- Gets
- 8 outputs