Workflows Directory
Find your team’s next superpower.
- Industry: Energy
- Industry: Engineering firms
- Industry: Logistics and trade
- Business situation: Established businesses
- Clear all filters
Results
74 workflow templates, showing 25 to 48
Evaluation unit trial review
When a customer's evaluation reaches its review milestone, the account engineer and account owner get a trial-review agenda that sets the agreed use case beside the recorded results, setup changes and feedback, with every gap turned into a question and next-step options.
- Starts it
- Account engineer
- Brings
- export, notes
- Gets
- 4 outputs
Field service invoice evidence check
When completed field work is ready for invoicing, the billing manager gets draft billing lines that tie the agreed rates to crew time, equipment use, mobilization and signed service tickets. Unsigned tickets, overlapping equipment days and unsupported extras are listed as exceptions.
- Starts it
- Billing manager
- Brings
- export, notes
- Gets
- 6 outputs
Freight shortage record packet
When a receiver reports missing or damaged freight, the claims coordinator gets one packet lining up dispatch quantities, warehouse scans, bill of lading, proof of delivery, photos and the customer report, with each unanswered question listed. It assigns no fault and sends nothing.
- Starts it
- Claims coordinator
- Brings
- export, notes
- Gets
- 6 outputs
Inbound receiving exception trace
When what arrived does not match the advance shipment notice, the receiving supervisor or inventory controller gets the notice, the packing list and the scans side by side by item and lot, with missing references and questions to investigate. Nothing is adjusted and nobody is contacted.
- Starts it
- Receiving supervisor
- Brings
- export, notes
- Gets
- 5 outputs
Incident investigation and corrective actions
After an injury, near miss or property damage, the site, operations or safety manager gets the investigation written up from the evidence: a timeline, the immediate and underlying causes, actions with owners and dates, and a register that follows each action until a check shows it worked.
- Starts it
- Site manager
- Brings
- export, notes, document
- Gets
- 8 outputs
Lone work arrangements review
For each task someone does alone, the manager gets the check-in method, the places where nobody could be reached, who responds when a check-in is missed and how soon, and alternatives. A competent person decides what is acceptable.
- Starts it
- Operations manager
- Brings
- export, notes
- Gets
- 6 outputs
Manager feedback preparation
Every manager walks into a feedback conversation prepared like your best one: specific dated observations, the questions worth asking, a clear ask and the support on offer.
- Starts it
- Team manager
- Brings
- notes, document
- Gets
- 7 outputs
Matter closing checklist preparation
When the handling lawyer flags a matter for closure, the firm's closing checklist is filled from the matter record: final billing as recorded, open tasks, unreturned items and the handoffs billing and records must accept.
- Starts it
- Operations assistant
- Brings
- export, notes, document
- Gets
- 5 outputs
Missed dock window recovery brief
The dispatch supervisor gets one brief when a truck misses its dock appointment and the reports disagree: each stated arrival time, the receiving cutoff, the appointment record and the questions that need a decision. It contacts no one and books nothing.
- Starts it
- Dispatch supervisor
- Brings
- export, notes
- Gets
- 8 outputs
Month-end close checklist
Before the month ends, your controller holds the whole close on one page: every task with its owner, its date and what it waits on, the chain that sets the close date, and each gap already written as a question. Entries are prepared for approval, never posted.
- Starts it
- Controller
- Brings
- export, notes
- Gets
- 5 outputs
Nonconformity record draft
A quality lead or supervisor who has spotted something wrong gets a draft record: the observation set against the stated requirement, the affected work counted from the register, and the containment options. The quality owner decides every call.
- Starts it
- Quality lead
- Brings
- export, notes
- Gets
- 1 output
Notification channel plan
When a business event needs to notify people, the integration owner gets one channel plan from the event definitions: trigger, urgency, who is told by which channel, what needs confirmation, fallbacks and reply handling. Consent and message rules stay as questions. Nothing is sent.
- Starts it
- Integration owner
- Brings
- export, notes
- Gets
- 1 output
Offtake statement variance check
When a buyer's offtake statement differs from the energy sales ledger, the settlement analyst gets one comparison: volumes, periods, prices and adjustments set against the metered-volume export and the agreed price inputs, each discrepancy traced to its source. Nothing is disputed or adjusted.
- Starts it
- Settlement analyst
- Brings
- export, notes
- Gets
- 6 outputs
Operations KPI scorecard
Once a month the operations manager gets one red-amber-green page for the ten or fewer measures that run the operation: each value worked out from your own exports, its trend, what moved and why in the owner's words, and the action agreed for every red. You set the measures and decide the actions.
- Starts it
- Operations manager
- Brings
- export, notes
- Gets
- 6 outputs
Policy answers from the handbook
Staff questions about leave, hours, expenses and conduct get answers that quote your own handbook, name the section, and say plainly where the handbook is silent. Anything about one person's own entitlement goes to HR, and no reply leaves until a person has read it.
- Starts it
- Office manager
- Brings
- export, notes, document
- Gets
- 4 outputs
Preventive maintenance plan
For one site, the facilities or operations manager gets every piece of equipment ranked by failure cost, an approach for each (run to failure, scheduled or condition-based), a dated calendar of tasks from the maker's guidance and the failure history, the spare parts to hold and the downtime measures to track.
- Starts it
- Facilities manager
- Brings
- export, notes
- Gets
- 6 outputs
Process map and bottleneck review
Map one process step by step: who does each step, how long work waits and how long it takes, where it is handed over and where it gets sent back. Then find the one step that caps how much gets finished, and what to try there first. The owner decides what changes.
- Starts it
- Operations lead
- Brings
- export, notes
- Gets
- 7 outputs
Product landed cost worksheet
After an import shipment lands, the owner or bookkeeper gets one worksheet: freight, duty, brokerage, insurance and inbound fees from the invoices spread over each product by a stated method, the landed unit cost beside the cost the store records, and the margin left. A person updates any cost.
- Starts it
- Owner
- Brings
- export, notes, document
- Gets
- 5 outputs
Project experience sheet
For one finished project and one proposal, turn the firm's approved project records into a one-page experience sheet: the firm's role, the scope it performed, partners' work kept apart, and the record behind each line. Names, images and permissions still to confirm are listed for sign-off.
- Starts it
- Proposal lead
- Brings
- export, notes, pasted text
- Gets
- 6 outputs
Project handover readiness check
When a finished deliverable is ready for the team that will run it, the project manager brings one checklist against that team's own requirements: acceptance evidence, instructions, access, training, support owners and open items. The receiving owner accepts or names the conditions still to meet.
- Starts it
- Project manager
- Brings
- export, notes
- Gets
- 6 outputs
Project intake and capacity review
When a new initiative is proposed, the portfolio owner sees it scored on the business's own criteria beside the projects already committed, the delivery days it would use month by month, and what it would crowd out or push later. The owner accepts, defers or rejects it.
- Starts it
- Portfolio owner
- Brings
- export, notes, document
- Gets
- 6 outputs
Project lessons review
When a phase or a project ends, the project manager gets one blameless review: whether it achieved what it was for, how scope, schedule and budget moved and why, whether the success measures were the right ones, and practice changes for the team to choose, each with an owner and a follow-up date.
- Starts it
- Project manager
- Brings
- export, notes
- Gets
- 8 outputs
Project scope baseline
A project manager turns an approved brief into a draft scope baseline: the deliverables, what is excluded, the acceptance criteria for each deliverable, the constraints and the open questions for the sponsor. Nothing implied counts as scope until the sponsor says so.
- Starts it
- Project manager
- Brings
- export, notes, document
- Gets
- 7 outputs
Project status report
The lead of an internal project gets a status report the sponsor can read in two minutes: each workstream red, amber or green with the reason, what moved, who must clear each blocker, the decisions needed and the dates at risk. No milestone is called done without evidence, and the lead confirms every status.
- Starts it
- Project lead
- Brings
- export, notes, pasted text
- Gets
- 7 outputs