Workflows Directory

Workflow templates for energy or real estate

Results

29 workflow templates, showing 1 to 24

  • Asset register to invoice reconciliation

    When new equipment, transfers or retirements must reach the reporting pack, the asset accountant gets a proposed register update matched to purchase records, commissioning evidence and the ledger, with duplicate IDs, unmatched invoices and uncertain in-service dates listed.

    Starts it
    Asset accountant
    Brings
    export, notes
    Gets
    8 outputs
  • Asset replacement options comparison

    When an aging asset has more than one proposed replacement or upgrade, the finance lead and the engineering owner get one workbook: the supplied costs, operating assumptions and lives on one basis, with price-basis gaps, unverified savings and open sensitivity questions marked. It recommends no spend.

    Starts it
    Finance analyst
    Brings
    export, notes
    Gets
    6 outputs
  • Contractor safety prequalification

    For a named job, the operations, facilities or site manager gets a safety questionnaire scaled to the risk of the work, then a record of the contractor's answers scored only on the evidence supplied, with every gap, the conditions that close it and a review date. A competent person decides.

    Starts it
    Operations manager
    Brings
    export, notes, document
    Gets
    7 outputs
  • Design assumption change register

    When client criteria or design assumptions change, the project engineer gets one sourced register: what changed, which recorded requirements it touches, how firm each source is, and what still needs confirmation. No design basis is altered.

    Starts it
    Project engineer
    Brings
    export, notes
    Gets
    6 outputs
  • Emissions activity data schedule

    When the reporting period closes, the environmental reporting owner gets one source-linked schedule of energy, fuel and transport quantities with units and the boundary supplied, estimates kept apart from measured activity, missing factor references and gaps listed. It calculates no emissions figure.

    Starts it
    Environmental reporting owner
    Brings
    export, notes
    Gets
    5 outputs
  • Engineering change affected records index

    When an engineering change request enters review, the document controller gets one index: the assemblies, revisions, stock and open purchase orders the change reaches in the exports supplied, and a question for each owner wherever the records are unclear.

    Starts it
    Document controller
    Brings
    export, notes
    Gets
    3 outputs
  • Evaluation unit trial review

    When a customer's evaluation reaches its review milestone, the account engineer and account owner get a trial-review agenda that sets the agreed use case beside the recorded results, setup changes and feedback, with every gap turned into a question and next-step options.

    Starts it
    Account engineer
    Brings
    export, notes
    Gets
    4 outputs
  • Executive week-ahead calendar review

    Before the week starts, the executive assistant hands the executive one brief: every clash, every journey or run of meetings with too little time, every meeting with no stated purpose or no preparation time, and proposed time for the week's priorities. Nothing is accepted, declined, moved or sent.

    Starts it
    Executive assistant
    Brings
    export, notes
    Gets
    7 outputs
  • Field service invoice evidence check

    When completed field work is ready for invoicing, the billing manager gets draft billing lines that tie the agreed rates to crew time, equipment use, mobilization and signed service tickets. Unsigned tickets, overlapping equipment days and unsupported extras are listed as exceptions.

    Starts it
    Billing manager
    Brings
    export, notes
    Gets
    6 outputs
  • Inbox triage

    The owner, or the assistant who keeps their inbox, starts the day knowing what needs a reply today, what can wait and until when, and what belongs to someone else, with a draft or a forwarding note for each. Nothing is sent, archived, deleted or moved, and no mailbox login is needed.

    Starts it
    Executive assistant
    Brings
    export, notes, pasted text
    Gets
    6 outputs
  • Lender draw package index

    Before a monthly draw goes to the lender, the project finance lead has an index in the lender’s own order: every required document listed or missing, and every invoice set against the ledger. The lender decides funding; nothing is submitted.

    Starts it
    Project accountant
    Brings
    export, notes
    Gets
    5 outputs
  • Listing copy fact check

    The listing agent or marketing lead gets draft listing copy in which every statement is tied to the property sheet, a measurement or a photo, with unsupported descriptions marked and kept out. The listing broker approves; the designated reviewer checks advertising requirements.

    Starts it
    Listing agent
    Brings
    export, notes, document, pasted text
    Gets
    6 outputs
  • Lone work arrangements review

    For each task someone does alone, the manager gets the check-in method, the places where nobody could be reached, who responds when a check-in is missed and how soon, and alternatives. A competent person decides what is acceptable.

    Starts it
    Operations manager
    Brings
    export, notes
    Gets
    6 outputs
  • Offtake statement variance check

    When a buyer's offtake statement differs from the energy sales ledger, the settlement analyst gets one comparison: volumes, periods, prices and adjustments set against the metered-volume export and the agreed price inputs, each discrepancy traced to its source. Nothing is disputed or adjusted.

    Starts it
    Settlement analyst
    Brings
    export, notes
    Gets
    6 outputs
  • Pay application line check

    Before a progress billing goes on, the project accountant has every line compared with the schedule of values, the last certificate, the approved changes and the evidence supplied, with each arithmetic difference listed. The authorized certifier decides payment; nothing is certified.

    Starts it
    Project accountant
    Brings
    export, notes
    Gets
    3 outputs
  • Preventive maintenance plan

    For one site, the facilities or operations manager gets every piece of equipment ranked by failure cost, an approach for each (run to failure, scheduled or condition-based), a dated calendar of tasks from the maker's guidance and the failure history, the spare parts to hold and the downtime measures to track.

    Starts it
    Facilities manager
    Brings
    export, notes
    Gets
    6 outputs
  • Property diligence index

    The transaction lead gets a diligence room in order: every document indexed by workstream, every checklist item and request tracked, and every open finding tied to the report or request that raised it. Specialists judge the findings; nothing is valued or sent.

    Starts it
    Transaction coordinator
    Brings
    export, notes
    Gets
    5 outputs
  • Property owner report

    A property manager gets the month's owner report drafted from the statements and logs they supply: occupancy, collections, open maintenance and the decisions the owner is asked to make, each statement traced to its source and each gap shown.

    Starts it
    Property manager
    Brings
    export, notes, document
    Gets
    6 outputs
  • Punch list consolidation

    The site manager gets the punch list for the next closeout walk as one list grouped by location and trade, with repeated entries merged, photographs attached and a proposed follow-up date for each open item. Nothing is assigned, closed or accepted.

    Starts it
    Site manager
    Brings
    export, notes
    Gets
    7 outputs
  • Recurring repair service history

    When repeated maintenance keeps disturbing guests, the facilities manager gets one brief by equipment and room area: repeated work orders, confirmed service interruptions and missing inspection records side by side. It finds no cause and orders no work.

    Starts it
    Facilities manager
    Brings
    export, notes
    Gets
    5 outputs
  • Rent roll to lease abstract match

    Your property accountant gets the rent roll checked against the verified lease abstracts and amendments, unit by unit: rent, area, commencement and expiration, with every difference listed for review. It compares supplied fields only and corrects nothing.

    Starts it
    Property accountant
    Brings
    export, notes, document
    Gets
    6 outputs
  • Service visit work packet

    Before a planned visit to a turbine, inverter or terminal asset, the maintenance supervisor gets one packet built from the logs and approved scope supplied: reported symptoms, previous visits, open parts requests and access questions. It judges no condition and sends nothing.

    Starts it
    Maintenance supervisor
    Brings
    export, notes
    Gets
    7 outputs
  • Spreadsheet check before sharing

    Before a model or schedule goes to a client, a lender or a board, the sender gets one report on it: every error value, short total, buried assumption and hidden row pinned to its cell, each with a fix or a question, and a plain list of what was not checked. Nothing in the workbook is changed.

    Starts it
    Finance manager
    Brings
    export, notes
    Gets
    5 outputs
  • Submittal register review

    The project engineer gets one register of every required submittal: what has arrived, the review status as recorded, the documents still missing and the long-lead items at risk against the date each order must be placed. Nothing is routed, accepted or ordered.

    Starts it
    Project engineer
    Brings
    export, notes
    Gets
    6 outputs