Capabilities directory
Find your team’s next superpower.
- Function: Finance and accounting
- Function: Procurement and suppliers
- Industry: Education
- Industry: Engineering firms
- Industry: Law firms
- Clear all filters
Results
15 capabilities
Client billing summary
Before an invoice goes out, the billing coordinator has a summary the client can read: fees by timekeeper, task and phase, expenses and write-downs, tied to the pre-bill. Every entry that breaks the client's billing guidelines reaches the responsible attorney as a decision, with the amount at stake.
Engagement margin review
Midway or at close, the partner and finance lead get one worksheet for an engagement: recorded time, agreed fee, billed to date and supplied costs by workstream, the gaps that limit it, and the questions the team must answer. No cost rate is invented.
Estimate basis pack
An estimator pricing a job from drawings, takeoffs and supplier quotes gets one worksheet: every figure with its quantity source, rate source and date beside it, each exclusion listed and every gap already written as a scope question. The estimator verifies; the bid lead decides the figure.
Matter budget and status summary
The responsible partner sees one matter whole: scope, phases against their dates, the budget against fees to date and the projected total, a red, amber or green status with the rule behind it, risks and next actions with owners. Built from the time export and the matter plan, never a view on the merits.
Matter closing checklist preparation
When the handling lawyer flags a matter for closure, the firm's closing checklist is filled from the matter record: final billing as recorded, open tasks, unreturned items and the handoffs billing and records must accept.
Matter-opening checklist preparation
Every accepted matter goes into setup and billing with one checklist: the fields each system needs, the terms that drive the first invoice, the documents on file and an owner for every open item.
Month-end close checklist
Before the month ends, your controller holds the whole close on one page: every task with its owner, its date and what it waits on, the chain that sets the close date, and each gap already written as a question. Entries are prepared for approval, never posted.
Overdue-invoice follow-up preparation
Every overdue invoice gets a follow-up drafted in your firm’s tone for its age and addressed from the right person, and every invoice that should not be chased is held with the reason written down.
Prebill exception review
Before the billing attorney opens a prebill, the billing coordinator has every awkward entry marked: rates that differ from the firm's rate table, possible duplicates, entries outside the client's billing guidelines, unclear narratives and expenses without support, each sent to the person who acts next.
Receivables exception review
The controller gets every short payment, unmatched or ambiguous receipt, possible duplicate and disputed invoice on one list, each with its evidence and a proposed next step, before anything is applied on a guess.
RFQ clarification list
A buyer sending drawings and specifications out for quotation gets one list of missing details, conflicting revisions and ambiguous tolerances, and a record of each supplier's answers. The buyer approves every message; the engineer settles every technical question.
SOP exception capture
Turn what your most experienced person does with the awkward cases into an exception register for one procedure. Once the owner approves it, every colleague handles those cases the way your best person does.
Submittal register review
The project engineer gets one register of every required submittal: what has arrived, the review status as recorded, the documents still missing and the long-lead items at risk against the date each order must be placed. Nothing is routed, accepted or ordered.
Three-week look-ahead constraint review
Before the coordination meeting, the superintendent gets a brief that sets each planned activity of the next three weeks beside what could hold it up: trades sharing an area, unfinished predecessors, open approvals, late deliveries and unanswered RFIs. The superintendent confirms the sequence and assigns the follow-up.
Weekly receivables summary
The finance lead takes one page into each week’s management meeting: what came in, where every receivable stands, which exceptions are open and who owns them, and the decisions management must make. Every figure ties to the aging report.