Capabilities directory
Find your team’s next superpower.
- Function: Leadership
- Function: People and HR
- Function: Project and delivery
- Industry: Energy
- Industry: Logistics and trade
- Clear all filters
Results
13 capabilities
Departing-employee knowledge capture
When someone is leaving or changing role, their manager gets an interview guide aimed at what only that person knows, then a handover document the successor can work from, every point traced to the conversations and marked with how sure it is. Nothing is shared until the manager approves.
Design assumption change register
When client criteria or design assumptions change, the project engineer gets one sourced register: what changed, which recorded requirements it touches, how firm each source is, and what still needs confirmation. No design basis is altered.
Employee onboarding plan
Every new colleague starts with a first week and a first 90 days planned to the standard of your best manager: what to read, who to meet, what to practice and what productive means at day 30, 60 and 90.
Goal alignment review
Before next period's goals are set, the chief executive sees every team goal mapped to the company priority it serves: goals with no company parent, goals that pull against each other, priorities nobody owns, and the questions for each owner. It judges goals, never people.
Internal change announcement
One decided change, announced well: managers briefed first, a message for each group in the right order, talking points, and the questions people will ask, answered only from the decision or marked open. Every message is a draft that a person approves and sends.
Manager feedback preparation
Every manager walks into a feedback conversation prepared like your best one: specific dated observations, the questions worth asking, a clear ask and the support on offer.
Policy answers from the handbook
Staff questions about leave, hours, expenses and conduct get answers that quote your own handbook, name the section, and say plainly where the handbook is silent. Anything about one person's own entitlement goes to HR, and no reply leaves until a person has read it.
Premortem before a decision
Before your team commits to a plan that is hard to undo, such as a move, a launch or a new system, a short workshop pictures it a few months on, already failed. The record ranks the reasons, turns each top risk into a check, a warning sign and an owner, and leaves the go decision with the owner.
Service visit work packet
Before a planned visit to a turbine, inverter or terminal asset, the maintenance supervisor gets one packet built from the logs and approved scope supplied: reported symptoms, previous visits, open parts requests and access questions. It judges no condition and sends nothing.
Site safety induction pack
For one named site, the site, facilities or people lead gets an induction built from that site's own emergency arrangements, rules and hazards, with a short check of understanding, a sign-off record for each person and refresher dates by role. A competent person approves it and delivers it.
Stakeholder and decision rights map
Before kickoff, the project manager holds one map of everyone the project touches: each group placed by influence and interest, every key decision with exactly one accountable owner, the decision makers still missing, and who hears what, when and from whom. The sponsor confirms every decision right.
Training needs analysis
For one team, the HR lead or team manager gets what each role must be able to do, how many people can do it now, where the team falls short, and the training to arrange first, with who arranges it and by when. Counted by role, never a rating of a named person.
Workflow fit check: is this piece of work ready for AI?
Before you build anything, run one piece of work through six checks and get a straight answer on one short page: build it, build one part, do something simpler first, not yet, or leave it with your people. The owner decides what gets built first, with the reasons in front of them.