Capabilities directory
Find your team’s next superpower.
- Function: People and HR
- Function: Project and delivery
- Industry: Education
- Industry: Energy
- Industry: Hospitality
- Industry: Insurance
- Industry: Manufacturing
- Clear all filters
Results
23 capabilities
Academic calendar check
While year, term and session dates are being assembled, your registrar gets a draft calendar with every registration window tied to its term, and every conflicting, missing or out-of-bounds date listed as a question. Nothing is published or changed.
Course sequence and workload review
A course lead revising an outline for the next cohort gets a module map: learning goals, prerequisites, activities and the instructor's own time estimates, with crowded weeks and coverage gaps marked and every gap written as a question. The course lead decides what changes.
Departing-employee knowledge capture
When someone is leaving or changing role, their manager gets an interview guide aimed at what only that person knows, then a handover document the successor can work from, every point traced to the conversations and marked with how sure it is. Nothing is shared until the manager approves.
Design assumption change register
When client criteria or design assumptions change, the project engineer gets one sourced register: what changed, which recorded requirements it touches, how firm each source is, and what still needs confirmation. No design basis is altered.
Employee health plan comparison
For an owner or people lead at renewal: the broker's health plan options next to each other, with premiums split between company and employee, deductibles, out-of-pocket limits, network notes, the cost to the company and to a typical employee at low, middle and high use, and questions for the broker.
Employee offboarding and handover checklist
When someone leaves, your HR lead and their manager share one checklist: every piece of their work handed to a named colleague before the last day, every system on your access register removed by its owner at a set time, and every item of equipment back. Nothing is removed or sent without a person.
Employee onboarding plan
Every new colleague starts with a first week and a first 90 days planned to the standard of your best manager: what to read, who to meet, what to practice and what productive means at day 30, 60 and 90.
Hiring pipeline status report
Each week your people lead or founder sees every open role on one page: applications at each stage, days open against the target, roles running late, pass-through between stages, which sources lead to interviews, and every blocker with its owner. It counts; it never assesses a candidate.
Internal change announcement
One decided change, announced well: managers briefed first, a message for each group in the right order, talking points, and the questions people will ask, answered only from the decision or marked open. Every message is a draft that a person approves and sends.
Interview process review after a hiring round
After a hiring round closes, the recruiting lead gets a review of the interview process: questions that gave no usable evidence, competencies nobody covered, inconsistent rubric use, and revisions to approve before the next search. It reviews the process only; no candidate is assessed.
Job description
A hiring manager’s rough notes become a job description the right people want to answer: why the role exists, the work itself, and only the must-haves that are real. Your approved pay and employer wording go in untouched, and nothing is posted until the hiring manager and the people lead approve it.
Payroll preparation and timesheet review
Before each payroll run, the owner gets one sheet built from the timesheet and roster exports: hours by person and type, every missing punch and odd entry raised as a question, and an estimated total. Nothing is keyed in, submitted or paid until a person approves.
Pilot build readiness brief
Before a prototype or pilot build, the build lead gets one brief: part shortages, revision conflicts and open actions set against the team’s own build checklist, with allocated parts kept apart from received ones. People confirm; nothing is released.
Policy answers from the handbook
Staff questions about leave, hours, expenses and conduct get answers that quote your own handbook, name the section, and say plainly where the handbook is silent. Anything about one person's own entitlement goes to HR, and no reply leaves until a person has read it.
Premortem before a decision
Before your team commits to a plan that is hard to undo, such as a move, a launch or a new system, a short workshop pictures it a few months on, already failed. The record ranks the reasons, turns each top risk into a check, a warning sign and an owner, and leaves the go decision with the owner.
Program outcome map
Before an evaluation, the program and evaluation leads get one map linking each activity to the outcome it is meant to serve, with proposed measures, data sources, assumptions and the questions the evidence cannot yet answer. It claims no impact.
Service roster options
For a department manager building a rota for expected occupancy, covers or events: two or three roster options side by side, with each role's need, the staff confirmed available, the periods left uncovered and the labor-cost assumptions you supplied. You verify and approve; nothing is published.
Service visit work packet
Before a planned visit to a turbine, inverter or terminal asset, the maintenance supervisor gets one packet built from the logs and approved scope supplied: reported symptoms, previous visits, open parts requests and access questions. It judges no condition and sends nothing.
Site safety induction pack
For one named site, the site, facilities or people lead gets an induction built from that site's own emergency arrangements, rules and hazards, with a short check of understanding, a sign-off record for each person and refresher dates by role. A competent person approves it and delivers it.
Staff newsletter and FAQ roundup
Each month the office manager turns what teams send in into one staff newsletter, with answers to the questions people keep asking, each quoted from an approved source and its owner named. Nothing about one person's pay, health or performance goes in, and a person approves the issue before it goes.
Stakeholder and decision rights map
Before kickoff, the project manager holds one map of everyone the project touches: each group placed by influence and interest, every key decision with exactly one accountable owner, the decision makers still missing, and who hears what, when and from whom. The sponsor confirms every decision right.
Training needs analysis
For one team, the HR lead or team manager gets what each role must be able to do, how many people can do it now, where the team falls short, and the training to arrange first, with who arranges it and by when. Counted by role, never a rating of a named person.
Volunteer shift options
A volunteer lead gets draft shift options once an event's availability replies are in: each role's needs set against who volunteered, the requirements on record and the shifts already confirmed, with every uncovered position shown. The lead checks and confirms; nothing is assigned or sent.